ted for the improvements recommended by the Senate Select Committee on Transportation Routes to the Seaboard, upon the four routes indicated by the report of said committee, and also upon a route indicated, forming an extension of the Chesapeake and Ohio Canal. These surveys have been assigned to officers having charge of works in the districts through which the proposed routes of communication pass. The appropriation was allotted to these officers in proportion to the extent and magnitude of the survey assigned each. Parties were organized and sent into the field at as early a day as possible, and it is trusted that sufficient data will be obtained to enable all the officers to submit projects for the improvements recommended, together with approximate estimates of cost of each, in time to be submitted before the close of the next session of Congress. It should be borne in mind, however, that, owing to the lateness of the passage of the act, the season favorable for active field-work was well advanced before the parties could commence operations.

The examinations or surveys directed to be made at certain specified localities named in the second section of the act of June 23, 1874, are now in process of execution. It is expected that reports upon the greater portion of these will be received in time for transmission during the approaching session of Congress.

The third section of the act made provision for the organization of a board of engineers, and directed that "said board shall make a survey of the mouth of the Mississippi River, with a view to determine the best method of obtaining and maintaining a depth of water sufficient for the purposes of commerce, either by canal from said river to the waters of the Gulf, or by deepening one or more of the natural outlets of said river," &c. The board was constituted by General Orders No. 74 of the War Department, dated July 2, 1874, and a copy of the section was incorporated in the order for the information and guidance of the members. The board is now engaged in the prosecution of the duties assigned, and will doubtless be able to comply with the requirement of the law as to the time of submitting the report.

In accordance with the requirements of the act approved June 22, 1874, "to provide for the appointment of a commission of engineers to investigate and report a permanent plan for the reclamation of the alluvial basin of the Mississippi River subject to inundation," a board of commissioners was constituted by General Orders No. 73 of the War Department, of July 2, 1874. The board has been organized, and the members are now actively engaged in making the investigations necessary to a full understanding and a proper presentation of the matter under consideration.

In connection with this subject, I have thought it advisable to include in the present communication (Appendix M 4) a report on the levees of the Mississippi, made by me to the Secretary of War in May, 1866, in pursuance of his instructions.

LAKE HARBORS AND RIVERS.

HARBORS ON LAKE SUPERIOR WEST OF KEWEENAW POINT.

Officer in charge, Maj. F. U. Farquhar, Corps of Engineers.

1. Improvement of the Bay of Superior from the natural entrance to the docks of superior City and Du Luth, and preservation of both entrances from the lake thereto, Minnesota and Wisconsin.-The work at these localities during the fiscal year comprised the completion of the piers at the Du

Luth Canal, and a small amount of dredging in Du Luth Harbor; the opening and protection of a cut through the dike across Superior Bay; the near completion of the piers at the natural entry, with some dredg ing between them, and the dredging of a channel from the deep waters of the bay to Quebec wharf, at Superior City.

The work during the fiscal year ending June 30, 1875, will be the completion of the piers at the natural entrance; some repairs to the piers at the Du Luth Canal, and dredging at the entrance to the harbor of Du Luth to give anchorage-ground and room for vessels to turn.

The completion of the plan for the improvement of the harbor of Da Luth, so that it may be available as a harbor of refuge, will require a large amount of dredging, which is estimated by the officer in charge at about 1,000,000 cubic yards, at the cost of about $270,000. An estimate of $100,000 is submitted for the commencement of this improvement.

The officer in charge recommends that the dike across Superior Bay be rebuilt so as to insure that no deterioration of the channel takes place at the natural entry. The estimated cost of this is $87,199, which could be most economically expended if included in one appropriation. A fund of $10,000 should also be available for repairs at the natural entry.

Balance in the Treasury of the United States July 1, 1873..
Amount in hands of officer and subject to his check.
Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874...

Amount required for the fiscal year ending For Du Luth
June 30, 1876, (as revised in this Office,){ For natural entry

(See Appendix A 1.)

$79,636 00 51,715 75 10,000 00 120,112 08

21, 239 67 100,000 00 10,000 00

2. Ontonagon Harbor, Michigan.-With the amount appropriated by the act of June 23, 1874, it is proposed to repair the inner end of West pier and prolong it inward 430 feet, and to make other repairs to the structures now protecting the entrance to this harbor.

It is estimated by the officer in charge that the cost of completing the works for the improvement of this harbor will be $238,717.08, and that $150,000 can be economically expended during the year ending June 30, 1876.

This harbor would, were it properly improved, be of great importance
as a harbor of refuge, as it is the only harbor on a long stretch of coast.
Balance in Treasury of the United States July 1, 1873..
Amount appropriated by act approved June 23, 1874.
Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876, (as revised in this
Office).

(See Appendix A 2.)

882 41 23,000 00

23, 082 41

50,000 00

3. Eagle Harbor, Michigan.-The estimate submitted in the last annual report for the excavation of a channel through the rock at the entrance to this harbor to a depth of 14 feet and a width of 130 feet, together with the building of a breakwater to cover the anchorage-ground, in all $248,000, has been revised by the officer now in charge, and reduced to $231,570, at the same time increasing the width of the breakwater from 20 feet to 30 feet.

No work has been done here during the past year, owing to the smallness of the funds on hand.

The officer in charge states that, should it be determined to make

this improvement, in order to prosecute it economically, a sum of at least $150,000 should be appropriated for the fiscal year.

Balance in Treasury of the United States July 1, 1873..

Amount in hands of officer and subject to his check.

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874....

Amount required for the fiscal year ending June 30, 1876, (as revised in this

Office)

(See Appendix A 3.)

$13,761 11

11,047 57

1,600 40

23, 208 28

50,000 00

HARBORS ON LAKE SUPERIOR EAST OF KEWEENAW POINT AND HARBORS ON THE WEST AND SOUTH SHORES OF LAKE MICHIGAN-IMPROVEMENT OF THE FOX AND WISCONSIN RIVERS.

Officer in charge, Maj. D. C. Houston, Corps of Engineers, with Capt. J. W. Cuyler, Corps of Engineers, to March 11, 1874, and Capt. G. J. Lydecker, Corps of Engineers, since May 11, 1874, under his imme

diate orders.

1. Marquette Harbor, Lake Superior, Michigan.—During the year the breakwater, as far as completed, was entirely filled with stone ballast and covered with a decking of three-inch plank.

The superstructure was completed over 5 cribs sunk in 1872, and 1 crib has been sunk in extension of the break water. About 180 cords of stone has been placed as riprap on the exposed side of the work.

The length of the work, as it now stands, is 1,960 feet, all complete except the superstructure over two cribs. It is proposed this season to extend the breakwater 50 feet, and complete the superstructure over the two cribs placed last year.

To render this work secure, it should be still further protected on the seaward side by a stone riprapping, for which an estimate is submitted. This will complete the breakwater as designed, at a cost of $296,730, or $88,399.58 less than the original estimate. Balance in Treasury of United States July 1, 1873..

$15,000 00

Amount in hands of officer and subject to his check, (including $2,373.83

percentage due on contracts not yet completed)..

24,802 07

Amount appropriated by act approved June 23, 1874..

15,000 00

Amount expended during the fiscal year ending June 30, 1874.

39,192 87

Amount available July 1, 1874.

15, 609 20

25,000 00

Amount required for the fiscal year ending June 30, 1876.

(See Appendix B 1.)

2. Menomonee Harbor, Michigan and Wisconsin.-During the year the south pier was extended 720 feet and the north pier 352 feet. During the present season it is proposed to extend each pier 128 feet and to dredge a channel 14 feet in depth and as wide as funds available will permit. The estimated cost of completing this harbor according to the plan adopted is $212,000. There has been appropriated $100,000.

The estimate submitted by the officer in charge for continuing this improvement is $50,000.

Balance in Treasury, of United States July 1, 1873.
Amount in hands of officer and subject to his check, (including $1,254.84 per-

$25,000 00

centage due on contracts not yet completed).

11,350 01

Amount appropriated by act approved June 23, 1874.

25,000 00

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874...

34, 837 69 26,512 32

Amount required for the fiscal year ending June 30, 1876, (as revised in this
Office).

(See Appendix B 2.)

25,000 00

3. Green Bay Harbor, Wisconsin.-During the year the deepening and widening of the channel from the mouth of the Fox River to Grassy

Island was carried out as contemplated, the appropriation of $20,000 in 1873 having been expended for this purpose.

The appropriation of this year, $10,000, will be expended in continuing this work and in repairing the revetment to the cuts through Grassy Island.

The sum of $45,000 is required to complete this chaunel, of which $25,000 may be expended to advantage during the year ending June 30, 1876.

Balance in Treasury of United States July 1, 1873..
Amount in hands of officer and subject to his check.

Amount appropriated by act approved June 23, 1874.

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876..

(See Appendix B 3.)

$10,000 00

9,726 00

10,000 00

19,662 38

10,063 62

25,000 00

4. Harbor of refuge at the entrance of the Sturgeon Bay Canal, Wiscon sin. This work was commenced about the beginning of the fiscal year, an appropriation of $40,000 having been made for it in 1873.

During the year two pile-piers were constructed, each 762 feet in length. The filling of the piers was not entirely completed.

The appropriation of 1874, $10,000, will be expended in completing this filling and in extending each pier 32 feet, increasing the width of the pier from 14 to 18 feet.

The estimate submitted by the officer in charge for the further extension of these piers is $60,000.

Balance in Treasury of United States July 1, 1873..

$20,000 00

Amount in hands of officer and subject to his check.

19,936 00

Amount appropriated by act approved June 23, 1874.

10,000 00

Amount expended during the fiscal year ending June 30, 1874..

37,980 55

Amount available July 1, 1874....

11,955 45

Amount required for the fiscal year ending June 30, 1876, (as revised in this
Office)..

(See Appendix B 4.)

40,000 00

5. Ahnapee Harbor, Wisconsin.-During the season of 1873, the balance of the appropriation for this harbor, made in 1872, since which time there has been no appropriation, was expended in extending the south pier 175 feet, making its total length 620 feet.

The north pier is 352 feet in length. The failure of the appropriation in 1873 left the work incomplete.

To make this harbor available for any purpose requires a channel to be dredged between the piers into the river.

The officer in charge submits an estimate, for continuing the improvement, of $50,000.

Amount in hands of officer and subject to his check...

Amount expended during the fiscal year ending June 30, 1874..

Amount available July 1, 1874..........

Amount required for fiscal year ending June 30, 1876, (as revised in this

[blocks in formation]

6. Two Rivers Harbor, Wisconsin.-During the past year the superstructure has been built over 1,031 feet of pile-foundation, and the piers filled with brush and stone, making the north pier 900 feet in length, and the south pier 965 feet. The dredge was employed in excavating a channel for vessels of light draught. During the present season the dredge will be employed in continuing the excavation. The piers will be refilled where the filling has settled, and the north side of the channel into the river revetted.

The appropriation of this year being but $15,000, and it being proposed to expend a portion of this sum in using the dredge at Ahnapee Harbor, (the cost of the dredge having been paid for equally out of the appropriations for these two harbors,) it will not be practicable to extend the piers this season, though such extension is necessary to the mainte nance of the channel.

An estimate is submitted by the officer in charge, for the extension of the piers and dredging, of $50,000.

Balance in Treasury of United States July 1, 1873..

Amount included in expenditures of year ending June 30, 1873, to be de

ducted from balance in Treasury..

Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874

Amount required for the fiscal year ending June 30, 1876, (as revised in this
Office)...

(See Appendix B 6.)

$25,000.00

2,892 94 15.000 00 22,055 70

15,051 36

25,000 00

7. Manitowoc Harbor, Wisconsin.-The work during the year has consisted in extending each pier 100 feet. It is proposed this season to make a further extension of 100 feet to each pier. A still further extension of 200 feet to each pier is necessary to carry them to a depth of 18 feet of water.

An estimate is submitted for a portion of this extension.
Balance in Treasury of United States July 1, 1873..
Amount in hands of officer and subject to his check.

Amount appropriated by act approved June 23, 1874.

Amount expended during the fiscal year ending June 30, 1874
Amount available July 1, 1874....

Amount required for the fiscal year ending June 30, 1876 .
(See Appendix B 7.)

$20,000 00

3,635 02

10,000 00

13,794 24

19,840 78

25,000 00

8. Sheboygan Harbor, Wisconsin.-During the year 288 feet of old superstructure have been removed and replaced by new work. These repairs will be continued, and the channel between the piers dredged out. The superstructure over the two cribs sunk in 1873 will also be built. The repairs of the old superstructure must be continued, and an estimate of $12,000 is submitted for the purpose.

Balance in Treasury of United States July 1, 1873

$10,000 00

Amount in hands of officer and subject to his check.
Amount appropriated by act approved June 23, 1874..

17,506 89

10,000 00

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874

21,496 09

16,010 =0

12,000 00

Amount required for the fiscal year ending June 30, 1876 (See Appendix B 8.)

9. Port Washington Harbor, Wisconsin.-The work during the year has consisted in extending each pier 100 feet, and in dredging 14,000 yards of material between the piers and in the basin.

The present appropriation of $10,000 will be applied to increasing the size of the basin and revetting its banks as fast as completed.

An estimate is submitted by the officer in charge, for continuing this

[blocks in formation]

Amount expended during the fiscal year ending June 30, 1874

21,804 64

Amount available July 1, 1874

10,638 14

Amount required for the fiscal year ending June 30, 1876, (as revised in this
Office)..

25,000 00

(See Appendix B 9.)