by the insurance company shall not be effective unless a copy of the cancellation is mailed (registered) to the Contracting Officer 30 days prior to the effective date of cancellation.

(d) A certificate of each policy of insurance, and any change therein, shall be furnished to the Contracting Officer immediately upon receipt from the insurance company.

(e) Insurance companies of the Contractor shall be satisfactory to the Contracting Officer. When in his/her opinion an insurance company is not satisfactory for reasons that will be stated, the Contractor shall provide insurance through companies that are satisfactory to the Contracting Officer.

(f) Each policy of insurance shall contain a provision that the insurance carrier waives any rights it may have to raise as a defense the tribe's sovereign immunity from suit, but such waivers shall extend only to claims the amount and nature of which are within the coverage and limits of the policy of insurance. The policy shall contain no provision, either expressed or implied, that will serve to authorize or empower the insurance carrier to waive or otherwise limit the tribe's sovereign immunity outside or beyond the coverage and limits of the policy insurance.

(End of clause)

CLAUSE NO. 20—OVERTIME (JUNE 1977) Except as provided in this contract, the Contractor shall not perform overtime work under or in connection with this contract for which premium compensation is required to be paid, without specific written approval from the Contracting Officer.

(End of clause)

CLAUSE NO. 21-FOREIGN TRAVEL (JUNE 1977)

Foreign travel shall not be performed without the prior written approval of the Contracting Officer. As used in this clause "Foreign Travel" means travel outside the United States, its Territories and Possessions, and Canada.

(End of clause)

CLAUSE NO. 22—QUESTIONNAIRE AND SURVEYS (JUNE 1977)

In the event the performance of this contract involves the collection of information upon identical items from 10 or more persons, other than Federal employees, the Contractor shall obtain written approval from the Contracting Officer, prior to the use thereof, of any forms, schedules, questionnaires, survey plans or other documents, and any revisions thereto, intended to be used in such collection.

(End of clause)

CLAUSE NO. 23—PRINTING (JUNE 1977) Unless otherwise specified in this contract, the Contractor shall not engage in, nor subcontract for, any printing (as that term is defined in Title I of the Government Printing and Binding Regulations in effect on the effective date of this contract) in connection with the performance of work under this contract; Provided, however, That performance of a requirement under this contract involving the reproduction of less than 5,000 production units of any one page or less than 25,000 production units in the aggregate of multiple pages, will not be deemed to be printing. A production unit is defined as one sheet, size 8 by 10 and 1⁄2 inches, one side only, one color.

(End of clause)

CLAUSE NO. 24-SERVICES OF CONSULTANTS (JUNE 1977)

Except as otherwise expressly provided elsewhere in this contract, and notwithstanding the provisions of the clause of this contract entitled "Subcontracting," the prior written approval of the Contracting Officer shall be required:

(a) Whenever any employee of the Contractor is to be reimbursed as a “consultant" under this contract; and

(b) For the utilization of the services of any consultant under this contract exceeding the daily rate set forth elsewhere in this contract or, if no amount is set forth, $100, exclusive of travel costs or where the services of any consultant under this contract will exceed 10 days in any calendar year. Whenever Contracting Officer approval is required, the Contractor will obtain and furnish to the Contracting Officer information concerning the need for such consultant services and the reasonableness of the fees to be paid, including but not limited to, whether fees to be paid to any consultant exceed the lowest fee charged by such consultant to others for performing consultant services of a similar nature.

(End of clause)

CLAUSE NO. 25—AssIGNMENT OF CLAIMS
(JUNE 1977)

(a) Pursuant to the provisions of the Assignment of Claims Act of 1940, as amended (31 U.S.C. 203, 41 U.S.C. 15), if this contract provides for payments aggregating $1,000 or more, claims for moneys due or to become due the Contractor from the Government under this contract may be assigned to a bank, trust company, or other financing institution, including any Federal lending agency, and may thereafter be further assigned and reassigned to any such institu

50-187 0-92--7

tion. Any such assignment or reassignment shall cover all amounts payable under this contract and not already paid, and shall not be made to more than one party, except that any such assignment or reassignment may be made to one party as agent or trustee for two or more parties participating in such financing. Unless otherwise provided in this contract, payment to assignee of any moneys due or to become due under this contract shall not, to the extent provided in said Act, as amended, be subject to reduction or setoff. (The preceding sentence applies only if this contract is made in time of war or national emergency as defined in said Act and is with the Department of Defense, the General Services Administration, the Atomic Energy Commission, the National Aeronautics and Space Administration, the Federal Aviation Agency or any other department or agency of the United States designated by the President pursuant to Clause 4 of the proviso of section 1 of the Assignment of Claims Act of 1940, as amended by the Act of May 15, 1951, 65 Stat. 41.)

(b) In no event shall copies of this contract or of any plans, specifications, or other similar documents relating to work under this contract, if marked "Top Secret," "Secret," or "Confidential," be furnished to any assignee of any claim arising under this contract or to any other person not entitled to receive the same. However, a copy of any part or all of this contract so marked may be furnished, or any information contained therein may be disclosed, to such assignee upon the prior written authorization of the Contracting Officer.

(End of clause)

CLAUSE NO. 26-CONTRACT WORK HOURS AND SAFETY STANDARD ACT-OVERTIME COMPENSATION (JUNE 1977)

This contract, to the extent that it is of a character specified in the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330), is subject to the following provisions and to all other applicable provisions and exceptions of such Act and the regulations of the Secretary of Labor thereunder. (a) Overtime requirements. No Contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any laborer or mechanic in any workweek in which he/ she is employed on such work to work in excess of eight hours in any calendar day or in excess of forty hours in such workweek on work subject to the provisions of the Contract Work Hours Standards Act unless such laborer or mechanic receives compensation at a rate not less than one and onehalf times his/her basic rate of pay for all such hours worked in excess of eight hours

in any calendar day or in excess of forty hours in such workweek, whichever is the greater number of overtime hours.

(b) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the provisions of paragraph (a), the Contractor and any subcontractor responsible therefor shall be liable to any affected employee for his/her unpaid wages. In addition, such Contractor and subcontractor shall be liable to the United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic employed in violation of the provisions of paragraph (a) in the sum of $10 for each calendar day on which such employee was required or permitted to be employed on such work in excess of eight hours or in excess of the standard workweek of forty hours without payment of the overtime wages required by paragraph (a).

(c) Withholding for unpaid wages and liquidated damages. The Contracting Officer may withhold from the Government Prime Contractor, from any moneys payable on account of work performed by the Contractor or subcontractor, such sums as may administratively be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in the provisions of paragraph (b).

(d) Subcontracts. The Contractor shall insert paragraphs (a) through (d) of this clause in all subcontracts, and shall require their inclusion in all subcontracts for any tier.

(e) Records. The Contractor shall maintain payroll records containing the information specified in 29 CFR 516.2(a). Such records shall be preserved for three years from the completion of the contract. This requirement does not apply where the tribal contractor is the governing body of the tribe and the work is being performed by the tribal contractor or the tribe with its regular employees.

(End of clause)

CLAUSE NO. 27-WALSH-HEALEY PUBLIC
CONTRACTS ACT (JUNE 1977)

If this contract is for the manufacture or furnishing of materials, supplies, articles, or equipment in an amount which exceeds or may exceed $10,000 and is otherwise subject to the Walsh-Healey Public Contracts Act, as amended (41 U.S. Code 35-45), there are hereby incorporated by reference all representations and stipulations required by said Act and regulations issued thereunder by the Secretary of Labor, such representations and stipulations being subject to all applicable rulings and interpretations of the Secretary of Labor which are now or may

(iv) As to which the Secretary determines the cost to the Government to be unreasonable.

(The foregoing requirements are administered in accordance with Executive Order No. 10582, dated December 17, 1954).

(End of clause)

CLAUSE NO. 34—ANTI-KICKBACK ACT (JUNE 1977)

(a) Public Law 86-695, September 2, 1960 (41 U.S.C. 51-54) among other things prohibits the payment, directly or indirectly, by or on behalf of a subcontractor in any tier under any Government negotiated contract of any fee, gift or gratuity to the prime contractor or any higher tier subcontractor or any officer, agent, partner or employee thereof, as an inducement or acknowledgment for the award of a subcontact or order. (b) The provisions of Public Law 86-695 are applicable to this contract and any subcontracts entered into under the contract.

(End of clause)

CLAUSE NO. 35-USE OF INDIAN BUSINESS
CONCERNS (JUNE 1977)

(a) As used in this clause, the term "Indian business concern" means Indian organizations or an Indian-owned economic enterprise as defined in 42 FR 36.204(i).

(b) The contractor agrees to give preference to qualified Indian business concerns in the awarding of any subcontracts entered into under the contract consistent with the efficient performance of the contract. The contractor shall comply with any preference requirements regarding Indian business concerns established by the Tribe(s) receiving services under the contract to the extent that such requirements are consistent with the purpose and intent of this paragraph.

(c) If no Indian business concerns are available under the conditions in paragraph (b) above, the Contractor agrees to accomplish the maximum amount of subcontracting, as the Contractor determines is consistent with its efficient performance of the contract, with small business

concerns,

labor surplus area concerns or minority business enterprises, the definitions for which are contained in Subparts 1-1.7, 1-1.8, and 1-1.13 of the Federal Procurement Regulations. The Contractor is not, however, required to establish a small business, labor surplus or minority business subcontracting program as described in sections 1-1.7102/h) 1-1.805-3(b), and 1-1.1310-2(b), respecof the Federal Procurement Regula11 CFR Chaper 1).

(End of clause)

CLAUSE NO. 36-PAYMENT OF INTEREST ON
CONTRACTOR'S CLAIMS (JUNE 1977)

(a) If an appeal is filed by the Contractor from a final decision of the Contracting Officer under the Disputes clause of this contract, denying a claim arising under the contract, simple interest on the amount of the claim finally determined owed by the Government shall be payable to the Contractor. Such interest shall be at the rate determined by the Secretary of the Treasury pursuant to P.L. 92-41, 85 Stat. 97, from the date the Contractor furnished to the Contracting Officer his written appeal under the Disputes clause of this contract, to the date of (1) a final judgment by a court of competent jurisdiction, or (2) mailing to the Contractor of a supplemental agreement for execution either confirming completed negotiations between the parties or carrying out a decision of a board of contract appeals.

(b) Notwithstanding (a), above, (1) interest shall be applied only from the date payment was due, if such date is later than the filing of appeals, and (2) interest shall not be paid for any period of time that the Contracting Officer determines the Contractor has unduly delayed in pursuing its remedies before a board of contract appeals or a court of competent jurisdiction.

The Contractor further agrees to comply with any rules, regulations and reporting requirements which may be imposed by the HHS Office for Civil Rights for purposes of insuring the proper exercise of this authority. The Contractor agrees to insert this clause in all subcontract(s) under this contract.

(End of clause)

CLAUSE NO. 37-FAIR AND EQUAL TREATMENT OF INDIAN PEOPLE (JUNE 1977)

(a) The Contractor agrees consistent with medical needs to make no discriminatory distinctions among Indian patients or beneficiaries of this contract. For the purpose of this contract discriminatory distinctions include but are not limited to the following:

(i) denying a patient any service or benefit or availability of a facility;

(ii) providing any service or benefit to a patient which is different, or is provided in a different manner or at a different time from that provided to other patients under this contract; subjecting a patient to segregation or separate treatment in any manner related to his/her receipt of any service; restricting a patient in any way in the enjoyment of any advantage or privilege enjoyed by others receiving any service or benefit; treating a patient differently from others in determining whether he/she satisfies any

(c) The Contractor agrees to include this clause or one similar thereto in all subcontracts issued under the contract.

(End of clause)

CLAUSE NO. 30-CERTIFICATE OF NONSEGREGATED FACILITIES (JUNE 1977)

are

By signing the contract the Contractor certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. It certifies further that it will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it will not permit its employees to perform their services at any location, under its control, where segregated facilities maintained. The Contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin, because of habit, local custom or otherwise. It further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause; that it will retain such certifications in its files; and that it will forward the following notice to such proposed subcontractors (except where the proposed subcontractors have submitted identical certifications for specific time periods):

Notice to prospective subcontractors of requirement for certifications of nonsegregated facilities. A certificate of Nonsegregated Facilities must be submitted prior to the award of a subcontract exceeding $10,000 which is not exempt from the provisions of the Equal Opportunity clause. The certification may be submitted either for each subcontract or for all subcontracts during a period (i.e., quarterly, semiannually, or annually).

(End of clause)

CLAUSE NO. 31-CONVICT LABOR (JUNE 1977) In connection with the performance of work under this contract, the Contractor

agrees not to employ any person undergoing sentence of imprisonment at hard labor, except as provided by Public Law 89-176, September 10, 1965 (18 U.S.C. 4082(c)(2)), and Executive Order No. 11755, December 29, 1973.

(End of clause)

CLAUSE NO. 32-OFFICIALS NOT TO BENEFIT (JUNE 1977)

No member of or delegate to Congress, or resident commissioner, shall be admitted to any share or part of this contract, or to any benefit that may arise therefrom; but this provision shall not be construed to extend to this contract if made with a corporation for its general benefit.

(End of clause)

CLAUSE NO. 33-BUY AMERICAN ACT FOR SUPPLY AND SERVICE CONTRACTS (JUNE 1977)

(a) In acquiring end products, the Buy American Act (41 U.S. Code 10a-d) provides that the Government give preference to domestic source end products. For the purpose of this clause:

(i) "Components" means those articles, materials, and supplies which are directly incorporated in the end products;

(ii) "End products" means those articles, materials, and supplies which are to be acquired under this contract for public use; and

(iii) A "domestic source end product" means (A) an unmanufactured end product which has been mined or produced in the United States and (B) an end product manufactured in the United States if the cost of the components thereof which are mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. For the purpose of this (a)(iii) (B), components of foreign origin of the same type or kind as the products referred to in (b) (ii) or (iii) of this clause shall be treated as components mined, produced or manufactured in the United States.

(b) The Contractor agrees that there will be delivered under this contract only domestic source end products, except end products:

(i) Which are for use outside the United States;

(ii) Which the Government determines are not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities and of a satisfactory quality;

(iii) As to which the Secretary determines the domestic preference to be inconsistent with the public interest; or

(iv) As to which the Secretary determines the cost to the Government to be unreasonable.

(The foregoing requirements are administered in accordance with Executive Order No. 10582, dated December 17, 1954).

(End of clause)

CLAUSE NO. 34—ANTI-KICKBACK ACT (JUNE 1977)

(a) Public Law 86-695, September 1960 (41 U.S.C. 51-54) among other things prohibits the payment, directly or indirectly, by or on behalf of a subcontractor in any tier under any Government negotiated contract of any fee, gift or gratuity to the prime contractor or any higher tier subcontractor or any officer, agent, partner or employee thereof, as an inducement or acknowledgment for the award of a subcontact or order. (b) The provisions of Public Law 86-695 are applicable to this contract and any subcontracts entered into under the contract.

(End of clause)

CLAUSE NO. 35-USE OF INDIAN BUSINESS
CONCERNS (JUNE 1977)

(a) As used in this clause, the term "Indian business concern" means Indian organizations or an Indian-owned economic enterprise as defined in 42 FR 36.204(i).

(b) The contractor agrees to give preference to qualified Indian business concerns in the awarding of any subcontracts entered into under the contract consistent with the efficient performance of the contract. The contractor shall comply with any preference requirements regarding Indian business concerns established by the Tribe(s) receiving services under the contract to the extent that such requirements are consistent with the purpose and intent of this paragraph.

(c) If no Indian business concerns are available under the conditions in paragraph (b) above, the Contractor agrees to accomplish the maximum amount of subcontracting, as the Contractor determines is consistent with its efficient performance of the contract, with small business concerns, labor surplus area concerns or minority business enterprises, the definitions for which are contained in Subparts 1-1.7, 1–1.8, and 1-1.13 of the Federal Procurement Regulations. The Contractor is not, however, required to establish a small business, labor surplus, or minority business subcontracting program as described in sections 1-1.7103(b), 1-1.805-3(b), and 1-1.1310-2(b), respectively, of the Federal Procurement Regulations (41 CFR Chaper 1).

(End of clause)

CLAUSE NO. 36-PAYMENT OF INTEREST ON CONTRACTOR's Claims (JUNE 1977)

(a) If an appeal is filed by the Contractor from a final decision of the Contracting Officer under the Disputes clause of this contract, denying a claim arising under the contract, simple interest on the amount of the claim finally determined owed by the Government shall be payable to the Contractor. Such interest shall be at the rate determined by the Secretary of the Treasury pursuant to P.L. 92-41, 85 Stat. 97, from the date the Contractor furnished to the Contracting Officer his written appeal under the Disputes clause of this contract, to the date of (1) a final judgment by a court of competent jurisdiction, or (2) mailing to the Contractor of a supplemental agreement for execution either confirming completed negotiations between the parties or carrying out a decision of a board of contract appeals.

(b) Notwithstanding (a), above, (1) interest shall be applied only from the date payment was due, if such date is later than the filing of appeals, and (2) interest shall not be paid for any period of time that the Contracting Officer determines the Contractor has unduly delayed in pursuing its remedies before a board of contract appeals or a court of competent jurisdiction.

The Contractor further agrees to comply with any rules, regulations and reporting requirements which may be imposed by the HHS Office for Civil Rights for purposes of insuring the proper exercise of this authority. The Contractor agrees to insert this clause in all subcontract(s) under this contract.

(End of clause)

CLAUSE NO. 37-FAIR AND EQUAL TREATMENT OF INDIAN PEOPLE (JUNE 1977)

(a) The Contractor agrees consistent with medical needs to make no discriminatory distinctions among Indian patients or beneficiaries of this contract. For the purpose of this contract discriminatory distinctions include but are not limited to the following:

(i) denying a patient any service or benefit or availability of a facility;

(ii) providing any service or benefit to a patient which is different, or is provided in a different manner or at a different time from that provided to other patients under this contract; subjecting a patient to segregation or separate treatment in any manner related to his/her receipt of any service; restricting a patient in any way in the enjoyment of any advantage or privilege enjoyed by others receiving any service or benefit; treating a patient differently from others in determining whether he/she satisfies any