With Benefit of Architect: A Manual for Those about to BuildMacmillan, 1968 - 277 pages |
From inside the book
Results 1-3 of 17
Page 192
... reasonably inferable therefrom as being necessary to produce the intended results . DETAIL DRAWINGS AND INSTRUCTIONS The Architect shall furnish with reasonable promptness , additional instructions by means of drawings or other- wise ...
... reasonably inferable therefrom as being necessary to produce the intended results . DETAIL DRAWINGS AND INSTRUCTIONS The Architect shall furnish with reasonable promptness , additional instructions by means of drawings or other- wise ...
Page 195
... reasonable time as the Architect may decide . No such extension shall be made for delay occurring more than seven days before claim therefor is made in writing to the Architect . In the case of a continuing cause of delay , only one ...
... reasonable time as the Architect may decide . No such extension shall be made for delay occurring more than seven days before claim therefor is made in writing to the Architect . In the case of a continuing cause of delay , only one ...
Page 200
... reasonable time after the dispute has arisen ; in no case , however , shall the demand be made later than the time of final pay- ment , except as otherwise expressly stipulated in the Contract . The arbitrators , if they deem that the ...
... reasonable time after the dispute has arisen ; in no case , however , shall the demand be made later than the time of final pay- ment , except as otherwise expressly stipulated in the Contract . The arbitrators , if they deem that the ...
Contents
A SMALL BUILDUP | 1 |
APPROACHES TO ARCHITECTURE | 5 |
HOW BUILDINGS SHAPE US | 20 |
Copyright | |
19 other sections not shown
Other editions - View all
Common terms and phrases
additional agree Agreement AIA DOC AIA DOCUMENT approval arbitration archi architectural ARTICLE bathrooms BATTEN BEDROOM bond budget builder called CARPORT ceiling Certificate for Payment CHANGE ORDER Chapter client complete concrete Construction Contract construction cost contour lines Contract amount Contract Documents contractor copy cost-plus decide decisions dollars door draftsman drawings and specifications DRYWALL electrical ELEV employees engineering evaporative cooling expense exterior extra finish firm floor plan formwork furnish GLASS Harriet Hauswirth residence HECUBA hire hy-par Imhotep Imitative INSTITUTE OF ARCHITECTS insulation interior design joists kitchen labor landscape lines lump-sum MARSHALL SHAPER materials ment method Owner percent percentage PLYWOOD preliminary design prime bidder probably problems professional project representative psychological effects reasonable roof sheets shop drawings sill SOFFIT studio sub-bids subcontractors tect tion tractor usually Utilitarian VAPOR BARRIER wall water heater WATERSPOUT whiteprints window wood zone