Professional Construction ManagementMcGraw-Hill Education, 1992 - 577 pages The subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. |
From inside the book
Results 1-3 of 89
Page 77
... Architect . A joint recommendation will be made to the Owner if found desirable . 4. Shop Drawings All shop drawings shall be submitted directly to the Architect by the CM Field Construction Manager . After approval , four copies will ...
... Architect . A joint recommendation will be made to the Owner if found desirable . 4. Shop Drawings All shop drawings shall be submitted directly to the Architect by the CM Field Construction Manager . After approval , four copies will ...
Page 511
... Architect by the Contractor and Certificates for Payment issued by the Architect , the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents . 5.2 ...
... Architect by the Contractor and Certificates for Payment issued by the Architect , the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents . 5.2 ...
Page 520
... Architect / Engineer , review requests for changes , submit recommendations to the Owner and the Architect / Engineer , and assist in negotiating Change Orders . 2.2.5 Payments to Trade Contractors : Develop and implement a procedure ...
... Architect / Engineer , review requests for changes , submit recommendations to the Owner and the Architect / Engineer , and assist in negotiating Change Orders . 2.2.5 Payments to Trade Contractors : Develop and implement a procedure ...
Contents
Construction Industry and Practice | 3 |
Development and Organization of Projects | 14 |
Applications and Requirements for Management | 41 |
Copyright | |
24 other sections not shown
Other editions - View all
Common terms and phrases
activities actual AGC DOCUMENT Agreement alternative applicable arbitration Architect Architect/Engineer ASCE Associated General Contractors award bar chart basic bid packages bidders budget Change Order chapter claims completion concept concrete construction contracts Construction Cost Construction Division construction industry Construction Manager's construction projects Contract Documents control system cost code critical path Critical Path Method delays design-construct detail developed Direct Cost dispute drawings economic effect employees equipment evaluation example factors fair-cost estimate Figure firms Guaranteed Maximum Price home office HVAC impact L. D. Miles labor liability major Masterformat materials methods negotiated normally open-shop operations organization overall owner parties payment percent performance prepared procedures procurement productivity professional construction manager program management progress Project Manager quality control responsibility risk schedule scope standard Structural Structural steel Subcontractor tion Total union unit utilized value engineering