The Code of Federal Regulations of the United States of AmericaU.S. Government Printing Office, 2005 The Code of Federal Regulations is the codification of the general and permanent rules published in the Federal Register by the executive departments and agencies of the Federal Government. |
From inside the book
Results 1-5 of 100
Page 15
... submit my final materials separation plan ? PRECONSTRUCTION REQUIREMENTS : SITING ANALYSIS 60.1110 Who must submit a siting analysis ? 60.1115 What is a siting analysis ? 60.1120 What steps must I complete for my siting analysis ...
... submit my final materials separation plan ? PRECONSTRUCTION REQUIREMENTS : SITING ANALYSIS 60.1110 Who must submit a siting analysis ? 60.1115 What is a siting analysis ? 60.1120 What steps must I complete for my siting analysis ...
Page 16
... submit it ? 60.1425 What must I include in the semi- annual out - of - compliance reports ? 60.1430 Can reporting ... submit before I submit my notice of construction ? 60.1380 What must I include in my notice of construction ? 60.1385 ...
... submit it ? 60.1425 What must I include in the semi- annual out - of - compliance reports ? 60.1430 Can reporting ... submit before I submit my notice of construction ? 60.1380 What must I include in my notice of construction ? 60.1385 ...
Page 18
... submit and in what form ? 60.1865 What are the appropriate units of measurement for reporting my data ? 60.1870 When must I submit the initial re- port ? 60.1875 What must I include in my initial re- port ? 60.1880 When must I submit ...
... submit and in what form ? 60.1865 What are the appropriate units of measurement for reporting my data ? 60.1870 When must I submit the initial re- port ? 60.1875 What must I include in my initial re- port ? 60.1880 When must I submit ...
Page 19
... submit my waste man- agement plan ? 60.2065 What should I include in my waste management plan ? OPERATOR TRAINING ... submit ? 60.2190 What must I submit prior to com- mencing construction ? 60.2195 What information must I submit prior ...
... submit my waste man- agement plan ? 60.2065 What should I include in my waste management plan ? OPERATOR TRAINING ... submit ? 60.2190 What must I submit prior to com- mencing construction ? 60.2195 What information must I submit prior ...
Page 20
... submit the notifica- tions of achievement of increments of progress ? 60.2595 What if I do not meet an increment of progress ? 60.2600 How do I comply with the increment of progress for submittal of a control plan ? 60.2605 How do I ...
... submit the notifica- tions of achievement of increments of progress ? 60.2595 What if I do not meet an increment of progress ? 60.2600 How do I comply with the increment of progress for submittal of a control plan ? 60.2605 How do I ...
Other editions - View all
Common terms and phrases
acid Administrator affected facility air pollution air pollution control Applicability and designation ASTM atmosphere average calculated calibrate carbon cility coal coating operation coating solids comply concentration control device deter determined dry basis emis emission limit emission rate equipment erator fected formance fuel furnace gas stream gases graph heat input hour incinerator initial performance test install kilograms landfill leak liquid Manufacturing means measured megagrams ment methods and procedures monitoring device monitoring system municipal solid waste municipal waste combustor ng/J nitrogen oxides opacity operator subject owner or operator oxides emission oxygen particulate matter percent performance test required period Petroleum Plants provisions records reduction reference methods sampling sions solvent startup steam generating unit submit subpart sulfur dioxide Surface Coating temperature Test methods tion Triple Superphosphate vent stream VOC emissions Volatile Organic Compound volume volumetric flow rate waste combustion unit
Popular passages
Page 498 - Rayon. A manufactured fiber composed of regenerated cellulose, as well as manufactured fibers composed of regenerated cellulose in which substituents have replaced not more than 15 percent of the hydrogens of the hydroxyl groups.
Page 627 - solid waste" means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return, flows or industrial discharges which...
Page v - There are no restrictions on the republication of textual material appearing in the Code of Federal Regulations. INQUIRIES For a legal interpretation or explanation of any regulation in this volume, contact the issuing agency. The issuing agency's name appears at the top of odd-numbered pages. For inquiries concerning CFR reference assistance, call 202-741-6000 or write to the Director, Office of the Federal Register, National Archives and Records Administration, Washington, DC 20408 or e-mail fedreg.info@nara.g...
Page 241 - For purposes of this subpart, under §60.15, the "fixed capital cost of the new components" includes the fixed capital cost of all depreciable components which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 2year period following January 17, 1984. For purposes of this paragraph, "commenced...
Page 272 - Steel production cycle means the operations conducted within the BOPF steelmaking facility that are required to produce each batch of steel and includes the following operations: scrap charging, preheating (when used), hot metal charging, primary oxygen blowing, sampling (vessel turndown and turnup), additional oxygen blowing (when used), tapping, and deslagging. This definition applies to an affected facility constructed, modified, or reconstructed after January 20, 1983. For an affected facility...
Page 428 - For purposes of this paragraph, "commenced" means that an owner or operator has undertaken a continuous program of component replacement or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of component replacement.
Page 402 - Process unit" means components assembled to produce, as intermediate or final products, one or more of the chemicals listed in §60.489 of this part. A process unit can operate independently if supplied with sufficient feed or raw materials and sufficient storage facilities for the product. "Process unit shutdown...
Page 46 - Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19.
Page 21 - State permit program approved by the Administrator as meeting the requirements of part 70 of this chapter or a Federal permit program established in this chapter pursuant to Title V of the Act (42 USC 7661). Capital expenditure means an expenditure for a physical or operational change to an existing facility which exceeds the product of the applicable "annual asset guideline repair allowance percentage...
Page 337 - Regenerative cycle gas turbine means any stationary gas turbine which recovers heat from the gas turbine exhaust gases to preheat the inlet combustion air to the gas turbine. (d) Combined cycle gas turbine means any stationary gas turbine which recovers heat from the gas turbine exhaust gases to heat water or generate steam. (e) Emergency gas turbine...