The Code of Federal Regulations of the United States of AmericaU.S. Government Printing Office, 2005 The Code of Federal Regulations is the codification of the general and permanent rules published in the Federal Register by the executive departments and agencies of the Federal Government. |
From inside the book
Results 1-5 of 100
Page 15
... startup , shutdown , and malfunction ? EMISSION LIMITS 60.1210 What pollutants are regulated by this subpart ? 60.1215 What emission limits must I meet ? By when ? 60.1220 What happens to the emission limits during periods of startup ...
... startup , shutdown , and malfunction ? EMISSION LIMITS 60.1210 What pollutants are regulated by this subpart ? 60.1215 What emission limits must I meet ? By when ? 60.1220 What happens to the emission limits during periods of startup ...
Page 17
... startup , shutdown , and malfunction ? MODEL RULE - EMISSION LIMITS 60.1700 What pollutants are regulated by this subpart ? 60.1705 What emission limits must I meet ? By when ? 60.1710 What happens to the emission limits during periods ...
... startup , shutdown , and malfunction ? MODEL RULE - EMISSION LIMITS 60.1700 What pollutants are regulated by this subpart ? 60.1705 What emission limits must I meet ? By when ? 60.1710 What happens to the emission limits during periods ...
Page 19
... startup , shutdown , and malfunction ? PERFORMANCE TESTING 60.2125 How do I conduct the initial and an- nual performance test ? 60.2130 How are the performance test data used ? INITIAL COMPLIANCE REQUIREMENTS 60.2135 How do I ...
... startup , shutdown , and malfunction ? PERFORMANCE TESTING 60.2125 How do I conduct the initial and an- nual performance test ? 60.2130 How are the performance test data used ? INITIAL COMPLIANCE REQUIREMENTS 60.2135 How do I ...
Page 21
60.2685 What happens during periods of startup , shutdown , and malfunction ? MODEL RULE - PERFORMANCE TESTING 60.2690 How do I conduct the initial and an- nual performance test ? 60.2695 How are the performance test data used ? MODEL ...
60.2685 What happens during periods of startup , shutdown , and malfunction ? MODEL RULE - PERFORMANCE TESTING 60.2690 How do I conduct the initial and an- nual performance test ? 60.2695 How are the performance test data used ? MODEL ...
Page 25
... Startup means the setting in oper- ation of an affected facility for any purpose . State means all non - Federal authori- ties , including local agencies , inter- state associations , and State - wide pro- grams , that have delegated ...
... Startup means the setting in oper- ation of an affected facility for any purpose . State means all non - Federal authori- ties , including local agencies , inter- state associations , and State - wide pro- grams , that have delegated ...
Other editions - View all
Common terms and phrases
acid Administrator affected facility air pollution air pollution control Applicability and designation ASTM atmosphere average calculated calibrate carbon cility coal coating operation coating solids comply concentration control device deter determined dry basis emis emission limit emission rate equipment erator fected formance fuel furnace gas stream gases graph heat input hour incinerator initial performance test install kilograms landfill leak liquid Manufacturing means measured megagrams ment methods and procedures monitoring device monitoring system municipal solid waste municipal waste combustor ng/J nitrogen oxides opacity operator subject owner or operator oxides emission oxygen particulate matter percent performance test required period Petroleum Plants provisions records reduction reference methods sampling sions solvent startup steam generating unit submit subpart sulfur dioxide Surface Coating temperature Test methods tion Triple Superphosphate vent stream VOC emissions Volatile Organic Compound volume volumetric flow rate waste combustion unit
Popular passages
Page 498 - Rayon. A manufactured fiber composed of regenerated cellulose, as well as manufactured fibers composed of regenerated cellulose in which substituents have replaced not more than 15 percent of the hydrogens of the hydroxyl groups.
Page 627 - solid waste" means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return, flows or industrial discharges which...
Page v - There are no restrictions on the republication of textual material appearing in the Code of Federal Regulations. INQUIRIES For a legal interpretation or explanation of any regulation in this volume, contact the issuing agency. The issuing agency's name appears at the top of odd-numbered pages. For inquiries concerning CFR reference assistance, call 202-741-6000 or write to the Director, Office of the Federal Register, National Archives and Records Administration, Washington, DC 20408 or e-mail fedreg.info@nara.g...
Page 241 - For purposes of this subpart, under §60.15, the "fixed capital cost of the new components" includes the fixed capital cost of all depreciable components which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 2year period following January 17, 1984. For purposes of this paragraph, "commenced...
Page 272 - Steel production cycle means the operations conducted within the BOPF steelmaking facility that are required to produce each batch of steel and includes the following operations: scrap charging, preheating (when used), hot metal charging, primary oxygen blowing, sampling (vessel turndown and turnup), additional oxygen blowing (when used), tapping, and deslagging. This definition applies to an affected facility constructed, modified, or reconstructed after January 20, 1983. For an affected facility...
Page 428 - For purposes of this paragraph, "commenced" means that an owner or operator has undertaken a continuous program of component replacement or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of component replacement.
Page 402 - Process unit" means components assembled to produce, as intermediate or final products, one or more of the chemicals listed in §60.489 of this part. A process unit can operate independently if supplied with sufficient feed or raw materials and sufficient storage facilities for the product. "Process unit shutdown...
Page 46 - Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19.
Page 21 - State permit program approved by the Administrator as meeting the requirements of part 70 of this chapter or a Federal permit program established in this chapter pursuant to Title V of the Act (42 USC 7661). Capital expenditure means an expenditure for a physical or operational change to an existing facility which exceeds the product of the applicable "annual asset guideline repair allowance percentage...
Page 337 - Regenerative cycle gas turbine means any stationary gas turbine which recovers heat from the gas turbine exhaust gases to preheat the inlet combustion air to the gas turbine. (d) Combined cycle gas turbine means any stationary gas turbine which recovers heat from the gas turbine exhaust gases to heat water or generate steam. (e) Emergency gas turbine...