Page images
PDF
EPUB
[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]

60.1010 Does this subpart apply to my municipal waste combustion unit? 60.1015 What is a new municipal waste combustion unit?

60.1020 Does this subpart allow any exemptions?

60.1025 Do subpart E new source performance standards also apply to my munic-. ipal waste combustion unit?

60.1030 Can the Administrator delegate authority to enforce these Federal new source performance standards to a State agency?

60.1035 How are these new source performance standards structured? 60.1040 Do all five components of these new source performance standards apply at the same time?

60.1045 Are there different subcategories of small municipal waste combustion units within this subpart?

PRECONSTRUCTION REQUIREMENTS: MATERIALS SEPARATION PLAN

60.1050 Who must submit a materials separation plan?

60.1055 What is a materials separation plan? 60.1060 What steps must I complete for my materials separation plan?

60.1065 What must I include in my draft materials separation plan?

60.1070 How do I make my draft materials separation plan available to the public? 60.1075 When must I accept comments on the materials separation plan? 60.1080 Where and when must I hold a public meeting on my draft materials separation plan?

60.1085 What must I do with any public comments I receive during the public comment period on my draft materials separation plan?

60.1090 What must I do with my revised materials separation plan? 60.1095 What must I include in the public meeting on my revised materials separation plan?

60.1100 What must I do with any public comments I receive on my revised materials separation plan?

60.1105 How do I submit my final materials separation plan?

PRECONSTRUCTION REQUIREMENTS: SITING

ANALYSIS

60.1110 Who must submit a siting analysis? 60.1115 What is a siting analysis?

60.1120 What steps must I complete for my siting analysis?

60.1125 What must I include in my siting analysis?

60.1130 How do I make my siting analysis available to the public?

60.1135 When must I accept comments on the siting analysis and revised materials separation plan?

60.1140 Where and when must I hold a public meeting on the siting analysis? 60.1145 What must I do with any public com

ments I receive during the public comment period on my siting analysis? 60.1150 How do I submit my siting analysis?

GOOD COMBUSTION PRACTICES: OPERATOR
TRAINING

60.1155 What types of training must I do? 60.1160 Who must complete the operator training course? By when?

60.1165 Who must complete the plant-specific training course?

60.1170 What plant-specific training must I provide?

60.1175 What information must I include in the plant-specific operating manual? 60.1180 Where must I keep the plant-specific operating manual?

GOOD COMBUSTION PRACTICES: OPERATOR

CERTIFICATION

60.1185 What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?

60.1190 After the required date for operator certification, who may operate the municipal waste combustion unit?

60.1195 What if all the certified operators must be temporarily offsite?

GOOD COMBUSTION PRACTICES: OPERATING REQUIREMENTS

60.1200 What are the operating practice requirements for my municipal waste combustion unit?

60.1205 What happens to the operating requirements during periods of startup, shutdown, and malfunction?

EMISSION LIMITS

60.1210 What pollutants are regulated by this subpart?

60.1215 What emission limits must I meet? By when?

60.1220 What happens to the emission limits during periods of startup, shutdown, and malfunction?

CONTINUOUS EMISSION MONITORING

60.1225 What types of continuous emission monitoring must I perform?

60.1230 What continuous emission monitoring systems must I install for gaseous pollutants?

60.1235 How are the data from the contin

uous emission monitoring systems used? 60.1240 How do I make sure my continuous

emission monitoring systems are operating correctly?

60.1245 Am I exempt from any appendix B or

appendix F requirements to evaluate continuous emission monitoring systems?

60.1250 What is my schedule for evaluating continuous emission monitoring systems?

60.1255 What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?

60.1260 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?

60.1265 How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?

60.1270 What is required for my continuous opacity monitoring system and how are the data used?

60.1275 What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 60.1280 What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?

STACK TESTING

60.1285 What types of stack tests must I conduct?

60.1290 How are the stack test data used?

« PreviousContinue »