Professional Construction ManagementThe subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. |
From inside the book
Results 1-3 of 82
Page 180
Assume also that the engineer has designed sev- eral similar plants in the past , and has thus negotiated his fee , say $ 800,000 including 20 percent ( $ 160,000 ) profit and general overhead , on the assumption that much of the design ...
Assume also that the engineer has designed sev- eral similar plants in the past , and has thus negotiated his fee , say $ 800,000 including 20 percent ( $ 160,000 ) profit and general overhead , on the assumption that much of the design ...
Page 386
It assumes that a large lot will be randomly sampled , and that the tolerable limit of defectives is normally 4 percent . The horizontal axis plots the actual percentage that is defective in a given lot , and the vertical axis indicates ...
It assumes that a large lot will be randomly sampled , and that the tolerable limit of defectives is normally 4 percent . The horizontal axis plots the actual percentage that is defective in a given lot , and the vertical axis indicates ...
Page 437
The dispersion of nonunion wages for any trade in any given area automatically tends to favor the union rate , which was generally some 30 to 50 percent higher than the average nonunion rate . Whether increased productiv- ity is ...
The dispersion of nonunion wages for any trade in any given area automatically tends to favor the union rate , which was generally some 30 to 50 percent higher than the average nonunion rate . Whether increased productiv- ity is ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Construction Industry and Practice | 3 |
Development and Organization of Projects | 14 |
Applications and Requirements for Management | 41 |
Copyright | |
31 other sections not shown
Other editions - View all
Common terms and phrases
activities actual additional Agreement alternative amount applicable approach Architect associated award basic become budget building changes chapter claims companies compared completion concept concrete contract Contract Documents contractor cost delays detail determine developed direct Documents drawings effect employees engineering equipment estimate evaluation example factors field Figure final finish firms impact important increase individual industry involved labor limited major materials methods negotiated normally operations organization overall owner parties payment percent performance period phase planning practices prepared problems procedures procurement productivity professional construction manager progress proposed quantities rates reasonable representative responsibility result risk safety savings schedule scope selection shown shows similar Special specifications standard structure Subcontractor summary Trade union unit utilized