Professional Construction ManagementThe subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. |
From inside the book
Results 1-3 of 81
Page 62
The following drawings were prepared by the architect.2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 : Foundation and Floor Plans , and Finish Schedule Drawing A - 2 : Roof Framing , Plan and Details Drawing A - 3 ...
The following drawings were prepared by the architect.2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 : Foundation and Floor Plans , and Finish Schedule Drawing A - 2 : Roof Framing , Plan and Details Drawing A - 3 ...
Page 103
5 The manager lists by number all drawings to be included as contract drawings and identifies drawings to be included as reference drawings . 6 Before the manager incorporates the package into the bidding documents , the designer ...
5 The manager lists by number all drawings to be included as contract drawings and identifies drawings to be included as reference drawings . 6 Before the manager incorporates the package into the bidding documents , the designer ...
Page 180
Two of the required drawings describe the electrical instrumentation and controls for a crushing and grinding circuit . Since it is similar to one done before , the engineering budget provided for it as follows : 80 design - hours x ...
Two of the required drawings describe the electrical instrumentation and controls for a crushing and grinding circuit . Since it is similar to one done before , the engineering budget provided for it as follows : 80 design - hours x ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Construction Industry and Practice | 3 |
Development and Organization of Projects | 14 |
Applications and Requirements for Management | 41 |
Copyright | |
31 other sections not shown
Other editions - View all
Common terms and phrases
activities actual additional Agreement alternative amount applicable approach Architect associated award basic become budget building changes chapter claims companies compared completion concept concrete contract Contract Documents contractor cost delays detail determine developed direct Documents drawings effect employees engineering equipment estimate evaluation example factors field Figure final finish firms impact important increase individual industry involved labor limited major materials methods negotiated normally operations organization overall owner parties payment percent performance period phase planning practices prepared problems procedures procurement productivity professional construction manager progress proposed quantities rates reasonable representative responsibility result risk safety savings schedule scope selection shown shows similar Special specifications standard structure Subcontractor summary Trade union unit utilized