Page images
PDF
EPUB

Senator MAGNUSON. What would you have asked for this study for 1963 if you had anticipated Governor Rosellini's request when the budget was being prepared?

Mr. MCCALLUM. Approximately $400,000.

Senator MAGNUSON. I have several attachments which I wish to offer for inclusion in the hearings bearing on the subject of my discussion with Mr. McCallum.

Senator HILL. Without objection, the material will be included in the hearings.

(The material referred to follows:)

(Attachment 1)

FEDERAL CONSTRUCTION PROJECTS REQUIRING FLOW AUGMENTATION STUDIES BY THE U.S. DEPARTMENT OF HEALTH, EDUCATION, and Welfare UNDER SECTION 2(b), FEDERAL WATER POLLUTION CONTROL ACT

[blocks in formation]

Rogue River Basin; Elk Creek Dam, Lost Creek Dam,

[blocks in formation]
[blocks in formation]

Attachment 2

TABULATION OF PROJECTS FOR THE GENERAL INVESTIGATIONS PROGRAM,

REGION 1

Department of the Interior, Bureau of Reclamation, Regional Office, Region 1,
Boise, Idaho-H. T. Nelson, regional director

[blocks in formation]

Rathdrum Prairie project, Idaho, Prairie division, East Greenacres unit____

Minidoka project, Idaho, American Falls Reservoir enlargement_
Monmouth Dallas project, Oregon__-

78,000

85,000

10, 101

Red Prairie project, Oregon___

1,554

74,000

Rogue River Basin project, Oregon (Medford and Illinois
Valley divisions) ___

160.000

Salmon Falls project, Idaho___

Snake River project, Idaho-Oregon (Garden Valley irrigation division, Montour unit, and Mountain Home division, Guffey unit) -

87,000

Taulatin project, Oregon__.

Snake River project, Idaho-Oregon, Mountain Sheep division__
Teton Basin project, Idaho, Lower Teton division___

45,627

20,000

145,000

Umatilla project, Oregon, South division, Birch Creek division unit_

12,000

Umpqua River project, Oregon, Olalla division_.

13, 396

Freewater, and Touchet divisions)

Ahtanum division___.

Upper Star Valley project, Wyoming_

Walla Walla project, Washington (Marcus Whitman, Milton

Yakima project, Washington:

Supplemental storage (Bumping Lake).

Miscellaneous studies (general and stream gaging).

Subtotal, project investigations--

Investigations of existing projects:

Missoula Valley project, Montana, Big Flat unit__

Subtotal investigations of existing projects....
Total cost program for region 1----

18, 245 67,000

109, 362

79,000

50,000

42, 000

1,458, 228

2,000

2.000

1,741, 228

U.S. Army Engineer Division, North Pacific Corps of Engineers, Portland, Oreg., Brig. Gen. W. W. Lapsley, division engineer

[blocks in formation]
[graphic][subsumed]

U.S. Army Engineer Division, North Pacific Corps of Engineers, Portland, Oreg., Brig. Gen. W. W. Lapsley, division engineer-Continued

OREGON

« PreviousContinue »