Page images
PDF
EPUB

the Secretary of the Interior, such bond to be with responsible surety to the satisfaction of the Secretary of the Interior and conditioned for the faithful performance of the covenants and conditions of the lease. Upon the filing with the Indian agent of such assignment, financial statement, and bond, the said agent shall at once give notice in writing to all restricted Indian owners of said land, advising them of said proposed assignment, and that if they have any bona fide objections to same, such objections must be filed in writing within 10 days from the date of said notice.

$215.21 Payment of gross production tax on lead and zinc.

The superintendent of the Quapaw Indian Agency is hereby authorized and directed to pay at the appropriate times, from the respective individual Indian funds held under his supervision, such gross production tax due the State on production of lead and zinc from restricted lands under his jurisdiction as may be properly assessed under provisions of law against the royalty interests of the respective Indian owners in the mineral produced from their lands.

$215.22 Operations.

securely

(a) All shafts shall be cribbed to a point at least 8 inches above the immediate surrounding surface and cribbing shall be maintained in good condition during the life of the mining lease: Provided, however, That at any time shafts may be permanently sealed by a reinforced concrete slab after first obtaining the written approval of the duly authorized representative of the Department of the Interior. The slab shall be so placed as to prevent caving of the ground around the shaft collar.

(b) All shafts, prior to the expiration, surrender, or upon cancellation of the mining lease or abandonment of the property, shall be permanently sealed So as to prevent the caving of the ground around the shaft collar: Provided, however, That this requirement may be waived after first obtaining the written consent of the duly authorized representative of the Department of the Interior.

(c) All shaft entrances not permanently sealed shall be so fenced, boxed, or covered as to prevent persons or animals from falling into the mine when the shaft is not in actual use, and such fencing, boxing, or covering shall be maintained in good condition during the life of the mining lease.

(d) All shafts where hoisting is done shall be boxed or fenced on three sides and the fourth side equipped with a gate which shall be kept closed when access to the shaft is not necessary.

(e) All churn drill holes shall be securely plugged to the surface unless used for ventilation or other mining purposes, in which case they shall be cased or otherwise prevented from caving or becoming a hazard to persons or animals. If cased, the casing shall extend 4 feet above the collar of the hole.

$215.23 Cooperation between superintendent and district mining supervisor.

(a) The district mining supervisor of the Miami field office, Geological Survey, directly or through his assistants, shall receive from lessees for the superintendent, all notices, reports, drill logs, maps, and records, and all other information relating to mining operations required by said regulations to be submitted by lessees, and shall maintain a file thereof for the superintendent.

(b) The files of the Geological Survey supervisor relating to lead and zinc leases of Quapaw Indian lands shall be at all times available for inspection and use by authorized employees of the Bureau of Indian Affairs, and the employees of the Geological Survey assigned to work relating to Indian lands shall furnish to authorized employees of the Bureau of Indian Affairs such information and technical advice as may be necessary or appropriate to the most efficient cooperation in the conduct of the work assigned to the two bureaus. Likewise, similar facilities and service shall be provided for the benefit of the authorized employees of the Geological Survey by the Bureau of Indian Affairs.

(c) No orders of any kind will be issued by Geological Survey representatives to any Indian, but such representatives shall have full authority

to issue and amend orders to operators relative to production and operations: i.e., the supervision of all operations, including safety and efficiency, health and sanitation, and prevention of material or economic waste, such orders to be prepared with the advice of the local representative of the Bureau of Indian Affairs.

CROSS REFERENCE: For regulations of the Geological Survey, see 30 CFR chapter II.

$215.23a Suspension of operations and production on leases for minerals other than oil and gas.

The provisions of § 212.15a of this subchapter are applicable to leases under this part.

[24 FR 9511, Nov. 26, 1959. Redesignated at 47 FR 13327, Mar. 30, 1982]

$215.24 Books and accounts.

(a) The lessee shall maintain books in which shall be kept a correct account of all ore and rock mined on the tract, of all ore put through the mill, of all lead and zinc concentrates produced, and of all ore and concentrates sold and to whom sold, the weight, assay value, moisture content, base price, dates, penalties, and price received, and the percentage of lead and zinc recovered. A correct statement of the same for each month shall be furnished the office of the district mining supervisor pursuant to §215.23 not later than 15 days after the first of each month for the preceding month, together with a certificate from the smelter showing the unit price paid for the mineral purchased and the amount of ore and concentrates purchased during the month from said land.

(b) An audit of the lessee's accounts and books shall be made semiannually, or at such other times as may be directed by the Secretary of the Interior, by certified public accountants, approved by the Secretary, and at the expense of the lessee. The lessee shall furnish free of cost a copy of such semiannual or other audit, through the office of the district mining supervisor pursuant to §215.23, within 30 days after the completion of each auditing.

[blocks in formation]

surface mining of, such minerals, adequate measures be taken to avoid, minimize, or correct damage to the environment-land, water, and air—and to avoid, minimize, or correct hazards to the public health and safety. The regulations in this part prescribe procedures to that end.

§ 216.2 Scope.

(a) Except as provided in paragraph (b) of this section, the regulations in this part provide for the protection and conservation of nonmineral resources during operations for the discovery, development, surface mining, and onsite processing of minerals under permits or leases issued pursuant to statutes pertaining to Indian lands including but not limited to the following statutes or amendments thereto:

The Act of June 28, 1906 (34 Stat. 539);

The Act of May 27, 1908 (35 Stat. 312); The Act of March 3, 1909 (35 Stat. 781, 25 U.S.C. 396);

The Act of May 1, 1936 (49 Stat. 1250); The Act of June 26, 1936 (49 Stat. 1967);

The Act of May 11, 1939 (52 Stat. 347, 25 U.S.C. 396a-f, and 5 U.S.C. 301).

(b) The regulations in this part do not cover the exploration for oil and gas or the issuance of leases, or operations thereunder, nor minerals underlying lands, the surface of which is not owned by the owner of the minerals.

(c) The regulations in this part shall apply only to permits or leases issued subsequent to the date on which these regulations become effective and which are subject to the approval of the Secretary of the Interior or his designated representative.

§ 216.3 Definitions.

As used in the regulations in the part:

(a) Superintendent means the superintendent or other officer of the Bureau of Indian Affairs having jurisdiction under delegated authority, over the lands involved.

(b) Mining supervisor means the Regional Mining Supervisor, or his authorized representative, of the Geological Survey authorized as provided in 30 CFR 211.3 and 231.2 to supervise operations on the land covered by a permit or lease.

(c) Overburden means all the earth and other materials which lie above a natural deposit of minerals and such earth and other materials after removal from their natural state in the process of mining.

(d) Area of land to be affected or area of land affected means the area of land from which overburden is to be or has been removed and upon which the overburden or waste is to be or has been deposited, and includes all lands affected by the construction of new roads or the improvement or use of existing roads to gain access to an operation and for haulage.

(e) Operation means all of the premises, facilities, roads, and equipment used in the process of determining the location, composition or quality of a mineral deposit, or in developing, extracting, or onsite processing of a mineral deposit in a designated area.

(f) Method of operation means the method or manner by which a cut or open pit is made, the overburden is placed or handled, water is controlled or affected and other acts performed by the operator in the process of exploring or uncovering and removing or onsite processing of a mineral deposit.

(g) Holder or operator means the permittee or lessee designated in a permit or lease.

(h) Reclamation means measures undertaken to bring about the necessary reconditioning or restoration of land or water that has been affected by exploration or mineral development, mining or onsite processing operations, and waste disposal, in ways which will prevent or control onsite and offsite damage to the environment.

§ 216.4 Technical examination of prospective surface exploration and mining operations.

(a)(1) In connection with an application for a permit or lease, the superintendent shall make, or cause to be made, a technical examination of the prospective effects of the proposed exploration or surface mining operations upon the environment. The technical examination shall take into consideration the need for the preservation and protection of other resources, including cultural, recreational, scenic, historic, and ecological values; and control of

erosion, flooding, and pollution of water; the isolation of toxic materials; the prevention of air pollution; the reclamation by revegetation, replacement of soil or by other means, of lands affected by the exploration or mining operations; the prevention of slides; the protection of fish and wildlife and their habitat; and the prevention of hazards to public health and safety.

(2) A technical examination of an area should be made with the recognition that actual potential mining sites and mining operations vary widely with respect to topography, climate, surrounding land uses, proximity to densely used areas, and other environmental influences and that mining and reclamation requirements should provide sufficient flexibility to permit adjustment to local conditions.

(b) Based upon the technical examination, the superintendent shall formulate the general requirements which the applicant must meet for the protection of nonmineral resources during the conduct of exploration or mining operations and for the reclamation of lands or waters affected by exploration or mining operations. The general requirements shall be made known in writing to the applicant before the issuance of a permit or lease and upon acceptance thereof by the applicant, shall be incorporated in the permit or lease.

(c) In each instance in which an application is made the mining supervisor shall participate in the technical examination and in the formulation of the general requirements.

(d) The superintendent may prohibit or otherwise restrict operations on any part of an area whenever it is determined that such part of the area described in an application for a permit or lease is such that previous experience under similar conditions has shown that operations cannot feasibly be conducted by any known methods or measures to avoid

(1) Rock or landslides which would be a hazard to human lives or endanger or destroy private or public property; or

(2) Substantial deposition of sediment and silt into streams, lakes, reservoirs; or

(3) A lowering of water quality below standards established by the appro

priate State water pollution control agency, or by the Secretary of the Interior, or his authorized representative;

or

(4) A lowering of the quality of waters whose quality exceeds that required by the established standardsunless and until it has been affirmatively demonstrated to the Secretary of the Interior, or his authorized representative, that such lowering of quality is necessary to economic and social development and will not preclude any assigned uses made of such waters: or

(5) The destruction of key wildlife habitat or important scenic, historical, or other natural or cultural features.

(e) If, on the basis of a technical examination, the superintendent determines that there is a likelihood that there will be a lowering of water quality as described in paragraphs (d) (3) and (4) of this section caused by the operation, no lease or permit shall be issued until after consultation with the Federal Water Pollution Control Administration and a finding by the Administration that the proposed operation would not be in violation of the Federal Water Pollution Control Act. as amended (33 U.S.C. 466 et seq.), or of Executive Order No. 11288 (31 FR 9261). Where a permit or lease is involved the Superintendent's determination shall be made in consultation with the mining supervisor.

§ 216.5 Basis for denial of a permit or lease.

An application for a permit or lease to conduct exploratory or mining operations may be denied any applicant who has forfeited a required bond because of failure to comply with a mining plan. However, a permit or lease may not be denied an applicant because of the forfeiture of a bond if the lands disturbed under his previous permit or lease have subsequently been reclaimed without cost to the lessor or the United States.

$216.6 Approval of exploration plan.

(a) Before commencing any surface disturbing operations to explore, test or prospect for minerals, the operator shall file with the mining supervisor a plan for the proposed exploration operations. The mining supervisor shall

consult with the superintendent with respect to the surface protection and reclamation aspects before approving said plan.

(b) Depending upon the size and nature of the operation and the requirements established pursuant to §216.4 the mining supervisor may require that the exploration plan submitted by the operator include any or all of the following:

(1) A description of the area within which exploration is to be conducted;

(2) Two copies of a suitable map or aerial photograph showing topographic, cultural and drainage features;

(3) A statement of proposed exploration methods; i.e., drilling, trenching, etc., and the location of primary support roads and facilities;

(4) A description of measures to be taken to prevent or control fire, soil erosion, pollution of surface and ground water, damage to fish and wildlife or other natural resources, and hazards to public health and safety both during and upon abandonment of exploration activities.

(c) The mining supervisor shall promptly review the exploration plan submitted to him by the operator and shall indicate to the operator any changes, additions, or amendments necessary to meet the requirements formulated pursuant to §216.4, the provisions of these regulations, and the terms of the permit.

(d) The operator shall comply with the provisions of an approved exploration plan. The mining supervisor may, with respect to such a plan, exercise the authority provided by paragraphs (f) and (g) of § 216.7 respecting a mining plan.

$216.7 Approval of mining plan.

(a) Before surface mining operations may commence under any permit or lease, the operator must file a mining plan with the mining supervisor and obtain his approval of the plan. The mining supervisor shall consult with the superintendent with respect to the surface protection and reclamation aspects before approving said plan.

(b) Depending on the size and nature of the operation and the requirements established pursuant to §216.4 the min

ing supervisor may require that the mining plan submitted by the operator include any or all of the following:

(1) A description of the location and area to be affected by the operations;

(2) Two copies of a suitable map, or aerial photograph showing the topography, the area covered by the permit or lease, the name and location of major topographic and cultural features, and the drainage plan away from the area affected;

(3) A statement of proposed methods of operating, including a description of proposed roads or vehicular trails; the size and location of structures and facilities to be built;

(4) An estimate of the quantity of water to be used and pollutants that are expected to enter any receiving waters;

(5) A design for the necessary impoundment, treatment or control of all runoff water and drainage from workings so as to reduce soil erosion and sedimentation and to prevent the pollution of receiving waters;

(6) A description of measures to be taken to prevent or control fire, soil erosion, pollution of surface and ground water, damage to fish and wildlife, and hazards to public health and safety; and

(7) A statement of the proposed manner and time of performance of work to reclaim areas disturbed by the holder's operation.

(c) In those instances in which the permit or lease requires the revegetation of an area of land to be affected, the mining plan shall show:

(1) Proposed methods of preparation and fertilizing the soil prior to replanting;

(2) Types and mixtures of shrubs, trees, or tree seedlings, grasses or legumes to be planted; and

(3) Types and methods of planting, including the amount of grasses or legumes per acre, or the number and spacing of trees, or tree seedlings, or combinations of grasses and trees.

(d) In those instances in which the permit or lease requires regrading and backfilling, the mining plan shall show the proposed methods and the timing of grading and backfilling of areas of land to be affected by the operation.

« PreviousContinue »