Subpart B-Criteria for Issuance of Permits to Aquaculture Projects

§ 125.10 Purpose and scope.

establish

(a) These regulations guidelines under sections 318 and 402 of the Act for approval of any discharge of pollutants associated with an aquaculture project.

(b) The regulations authorize, on a selective basis, controlled discharges which would otherwise be unlawful under the Act in order to determine the feasibility of using pollutants to grow aquatic organisms which can be harvested and used beneficially. EPA policy is to encourage such projects, while at the same time protecting other beneficial uses of the waters.

(c) Permits issued for discharges into aquaculture projects under this subpart are NPDES permits and are subject to the applicable requirements of Parts 122, 123 and 124. Any permit shall include such conditions (including monitoring and reporting requirements) as are necessary to comply with those parts. Technology-based effluent limitations need not be applied to discharges into the approved project except with respect to toxic pollutants.

[blocks in formation]

(a) No NPDES permit shall be issued to an aquaculture project unless:

(1) The Director determines that the aquaculture project:

(i) Is intended by the project operator to produce a crop which has significant direct or indirect commercial value (or is intended to be operated for research into possible production of such a crop); and

(ii) Does not occupy a designated project area which is larger than can be economically operated for the crop under cultivation or than is necessary for research purposes.

(2) The applicant has demonstrated, to the satisfaction of the Director, that the use of the pollutant to be discharged to the aquaculture project

will result in an increased harvest of organisms under culture over what would naturally occur in the area;

(3) The applicant has demonstrated, to the satisfaction of the Director, that if the species to be cultivated in the aquaculture project is not indigenous to the immediate geographical area, there will be minimal adverse effects on the flora and fauna indigenous to the area, and the total commercial value of the introduced species is at least equal to that of the displaced or affected indigenous flora and fauna;

(4) The Director determines that the crop will not have a significant potential for human health hazards resulting from its consumption;

(5) The Director determines that migration of pollutants from the designated project area to water outside of the aquaculture project will not cause or contribute to a violation of water quality standards or a violation of the applicable standards and limitations applicable to the supplier of the pollutant that would govern if the aquaculture project were itself a point source. The approval of an aquaculture project shall not result in the enlargement of a pre-existing mixing zone area beyond what had been designated by the State for the original discharge.

(b) No permit shall be issued for any aquaculture project in conflict with a plan or an amendment to a plan approved under section 208(b) of the Act.

(c) No permit shall be issued for any aquaculture project located in the territorial sea, the waters of the contiguous zone, or the oceans, except in conformity with guidelines issued under section 403(c) of the Act.

(d) Designated project areas shall not include a portion of a body of water large enough to expose a substantial portion of the indigenous biota to the conditions within the designated project area. For example, the designated project area shall not include the entire width of a watercourse, since all organisms indigenous to that watercourse might be subjected to discharges of pollutants that would, except for the provisions of section 318 of the Act, violate section 301 of the Act.

through the use of "non-treatment" techniques such as flow augmentation and in-stream mechanical aerators.

However, these techniques may be considered as a method of achieving water quality standards on a case-bycase basis when:

(1) The technology-based treatment requirements applicable to the discharge are not sufficient to achieve the standards;

(2) The discharger agrees to waive any opportunity to request a variance under section 301 (c), (g) or (h) of the Act; and

(3) The discharger demonstrates that such a technique is the preferred environmental and economic method to achieve the standards after consideration of alternatives such as advanced waste treatment, recycle and reuse, land disposal, changes in operating methods, and other available methods.

(g) Technology-based effluent limitations shall be established under this subpart for solids, sludges, filter backwash, and other pollutants removed in the course of treatment or control of wastewaters in the same manner as for other pollutants.

(h)(1) The Director may set a permit limit for a conventional pollutant at a level more stringent than the best conventional pollution control technology (BCT), or a limit for a nonconventional pollutant which shall not be subject to modification under section 301 (c) or (g) of the Act where:

(i) Effluent limitations guidelines specify the pollutant as an indicator for a toxic pollutant, or

are

(ii)(A) The limitation reflects BATlevel control of discharges of one or more toxic pollutants which present in the waste stream, and a specific BAT limitation upon the toxic pollutant(s) is not feasible for economic or technical reasons;

(B) The permit identifies which toxic pollutants are intended to be controlled by use of the limitation; and

(C) The fact sheet required by § 124.56 sets forth the basis for the limitation, including a finding that compliance with the limitation will result in BAT-level control of the toxic pollutant discharges identified in para

graph (h)(1)(ii)(B) of this section, and a finding that it would be economically or technically infeasible to directly limit the toxic pollutant(s).

(2) The Director may set a permit limit for a conventional pollutant at a level more stringent than BCT when:

(i) Effluent limitations guidelines specify the pollutant as an indicator for a hazardous substance, or

(ii)(A) The limitation reflects BATlevel control of discharges (or an appropriate level determined under section 301(c) or (g) of the Act) of one or more hazardous substance(s) which are present in the waste stream, and a specific BAT (or other appropriate) limitation upon the hazardous substance(s) is not feasible for economic or technical reasons;

(B) The permit identifies which hazardous substances are intended to be controlled by use of the limitation; and

(C) The fact sheet required by § 124.56 sets forth the basis for the limitation, including a finding that compliance with the limitations will result in BAT-level (or other appropriate level) control of the hazardous substances discharges identified in paragraph (h)(2)(ii)(B) of this section, and a finding that it would be economically or technically infeasible to directly limit the hazardous substance(s).

(iii) Hazardous substances which are also toxic pollutants are subject to paragraph (h)(1) of this section.

(3) The Director may not set a more stringent limit under the preceding paragraphs if the method of treatment required to comply with the limit differs from that which would be required if the toxic pollutant(s) or hazardous substance(s) controlled by the limit were limited directly.

(4) Toxic pollutants identified under paragraph (h)(1) of this section remain subject to the requirements of § 122.42(a)(1) (notification of increased discharges of toxic pollutants above levels reported in the application form).

(Clean Water Act, Safe Drinking Water Act, Clean Air Act, Resource Conservation and Recovery Act: 42 U.S.C. 6905, 6912, 6925, 6927, 6974)

[44 FR 32948, June 7, 1979, as amended at 45 FR 33512, May 19, 1980; 48 FR 14293, Apr. 1, 1983; 49 FR 38052, Sept. 26, 1984; 50 FR 6941, Feb. 19, 1985; 54 FR 257, Jan. 4, 1989]

Subpart B-Criteria for Issuance of Permits to Aquaculture Projects

§ 125.10 Purpose and scope.

establish

(a) These regulations guidelines under sections 318 and 402 of the Act for approval of any discharge of pollutants associated with an aquaculture project.

(b) The regulations authorize, on a selective basis, controlled discharges which would otherwise be unlawful under the Act in order to determine the feasibility of using pollutants to grow aquatic organisms which can be harvested and used beneficially. EPA policy is to encourage such projects, while at the same time protecting other beneficial uses of the waters.

(c) Permits issued for discharges into aquaculture projects under this subpart are NPDES permits and are subject to the applicable requirements of Parts 122, 123 and 124. Any permit shall include such conditions (including monitoring and reporting requirements) as are necessary to comply with those parts. Technology-based effluent limitations need not be applied to discharges into the approved project except with respect to toxic pollutants.

[blocks in formation]

(a) No NPDES permit shall be issued to an aquaculture project unless:

(1) The Director determines that the aquaculture project:

(i) Is intended by the project operator to produce a crop which has significant direct or indirect commercial value (or is intended to be operated for research into possible production of such a crop); and

(ii) Does not occupy a designated project area which is larger than can be economically operated for the crop under cultivation or than is necessary for research purposes.

(2) The applicant has demonstrated, to the satisfaction of the Director, that the use of the pollutant to be discharged to the aquaculture project

will result in an increased harvest of organisms under culture over what would naturally occur in the area;

(3) The applicant has demonstrated, to the satisfaction of the Director, that if the species to be cultivated in the aquaculture project is not indigenous to the immediate geographical area, there will be minimal adverse effects on the flora and fauna indigenous to the area, and the total commercial value of the introduced species is at least equal to that of the displaced or affected indigenous flora and fauna;

(4) The Director determines that the crop will not have a significant potential for human health hazards resulting from its consumption;

(5) The Director determines that migration of pollutants from the designated project area to water outside of the aquaculture project will not cause or contribute to a violation of water quality standards or a violation of the applicable standards and limitations applicable to the supplier of the pollutant that would govern if the aquaculture project were itself a point source. The approval of an aquaculture project shall not result in the enlargement of a pre-existing mixing zone area beyond what had been designated by the State for the original discharge.

(b) No permit shall be issued for any aquaculture project in conflict with a plan or an amendment to a plan approved under section 208(b) of the Act.

(c) No permit shall be issued for any aquaculture project located in the territorial sea, the waters of the contiguous zone, or the oceans, except in conformity with guidelines issued under section 403(c) of the Act.

(d) Designated project areas shall not include a portion of a body of water large enough to expose a substantial portion of the indigenous biota to the conditions within the designated project area. For example, the designated project area shall not inIclude the entire width of a watercourse, since all organisms indigenous to that watercourse might be subjected to discharges of pollutants that would, except for the provisions of section 318 of the Act, violate section 301 of the Act.

(e) Any modifications caused by the construction or creation of a reef, barrier or containment structure shall not unduly alter the tidal regimen of an estuary or interfere with migrations of unconfined aquatic species.

[Comment: Any modifications described in this paragraph which result in the discharge of dredged or fill material into navigable waters may be subject to the permit requirements of section 404 of the Act.]

(f) Any pollutants not required by or beneficial to the aquaculture crop shall not exceed applicable standards and limitations when entering the designated project area.

Subpart C-Criteria for Extending Compliance Dates for Facilities Installing Innovative Technology Under Section 301(k) of the Act

SOURCE: 49 FR 25981, June 25, 1984, unless otherwise noted.

§ 125.20 Purpose and scope.

This subpart establishes the criteria and procedures to be used in determining whether an industrial discharger will be granted a compliance extension for the installation of an innovative technology.

§ 125.21 Statutory authority.

Section 301(k) provides that the Administrator (or a State with an approved NPDES program, in consultation with the Administrator) may grant a compliance extension for BAT limitations to a discharger which installs an innovative technology. The innovative technology must produce either a significantly greater effluent reduction than that achieved by the best available technology economically achievable (BAT) or the same level of treatment as BAT at a significantly lower cost. The Administrator is authorized to grant compliance extensions to a date no later than 2 years after the date for compliance with the effluent limitation which would otherwise be applicable.

[54 FR 257, Jan. 4, 1989]

[blocks in formation]

lution control technique, or a combination of the two which satisfies one of the criteria in § 125.23 and which has not been commercially demonstrated in the industry of which the requesting discharger is a part.

(b) The term “potential for industrywide application” means that an innovative technology can be applied in two or more facilities which are in one or more industrial categories.

(c) The term "Significantly greater effluent reduction than BAT" means that the effluent reduction over BAT produced by an innovative technology is significant when compared to the effluent reduction over best practicable control technology currently available (BPT) produced by BAT.

(d) The term "significantly lower cost" means that an innovative technology must produce a significant cost advantage when compared to the technology used to achieve BAT limitations in terms of annual capital costs and annual operation and maintenance expenses over the useful life of the technology.

§ 125.23 Request for compliance extension.

The Director shall grant a compliance extension to a date no later than 2 years after the date for compliance with the effluent limitation which would otherwise be applicable, to a discharger that demonstrates:

(a) That the installation and operation of its proposed innovative technology at its facility will result in a significantly greater effluent reduction than BAT and has the potential for industry-wide application; or

(b) That the installation and operation of its proposed innovative technology at its facility will result in the same effluent reduction as BAT at a significantly lower cost and has the potential for industry-wide application.

[44 FR 32948, June 7, 1979, as amended at 54 FR 257, Jan. 4, 1989]

§ 125.24 Permit conditions.

The Director may include any of the following conditions in the permit of a discharger to which a compliance ex

tension beyond the otherwise applicable compliance date is granted:

(a) A requirement that the discharger report annually on the installation, operation, and maintenance costs of the innovative technology;

(b) Alternative BAT limitations that the discharger must meet as soon as possible and not later than 2 years after the date for compliance with the effluent limitation which would otherwise be applicable if the innovative technology limitations that are more stringent than BAT are not achievable.

[49 FR 25981, June 25, 1984; 49 FR 28560, July 13, 1984, as amended at 54 FR 257, Jan. 4, 1989]

§ 125.25 Signatories to request for compliance extension.

(a) All section 301(k) requests must be signed in accordance with the provisions of 40 CFR 122.22.

(b) Any person signing a request under paragraph (a) of this section shall make the following certification:

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

(c) A professional engineer shall certify that the estimates by the applicant of the costs for the BAT control equipment and for the innovative technology are made in accordance with good engineering practice and represent, in his judgment, the best information available. The Director may waive the requirements for certification under this subsection if, in his opinion, the cost of such certification is unreasonable when compared to the annual sales of the applicant.

§ 125.26 Supplementary information and

recordkeeping.

(a) In addition to the information submitted in support of the request, the applicant shall provide the Director, at his or her request, such other information as the Director may rea

[blocks in formation]

(a) The procedure for requesting a section 301(k) compliance extension is contained in §§ 124.62 and 124.63. In addition, notwithstanding

§ 122.21(m)(4), the Director may accept applications for such extensions after the close of the public comment period on the permit if the applicant can show that information necessary to the development of the innovation was not available at the time the permit was written and that the innovative technology can be installed and operated in time to comply no later than 2 years after the date for compliance with the effluent limitation which would otherwise be applicable.

(b) The procedure for appealing a decision on a request for a compliance extension is contained in §§ 124.60 and 124.64.

(Approved by the Office of Management and Budget under the control number 20400066)

[49 FR 25981, June 25, 1984, as amended at 54 FR 257, Jan. 4, 1989]

Subpart D-Criteria and Standards for Determining Fundamentally Different Factors Under Sections 301(b)(1)(A), 301(b)(2) (A) and (E) of the Act

§ 125.30 Purpose and scope.

(a) This subpart establishes the criteria and standards to be used in determining whether effluent limitations alternative to those required by promulgated EPA effluent limitations guidelines under sections 301 and 304 of the Act (hereinafter referred to as "national limits") should be imposed on a discharger because factors relating to the discharger's facilities, equipment, processes or other factors related to the discharger are fundamentally different from the factors consid