Page images
PDF
EPUB

retary shall obtain data necessary to determine

(A) within 6 months after August 13, 1981, the total quantities of natural gas used as a primary energy source by each electric utility during calendar year 1977, and

(B) on a semiannual basis, the total quantities of natural gas used as a primary energy source during the previous 6-month period by each electric utility.

(2) The Secretary shall include in each annual report to the Congress under section 8482 of this title a summary of information received by the Secretary under this subsection. (Pub. L. 95-620, title VII, § 711, Nov. 9, 1978, 92 Stat. 3332; Pub. L. 97-35, title X, § 1021(b), Aug. 13, 1981, 95 Stat. 615; Pub. L. 100-42, § 1(c)(17), May 21, 1987, 101 Stat. 313.)

AMENDMENTS

1987-Subsec. (a). Pub. L. 100-42 struck out "or major fuel-burning installation" after "powerplant". 1981-Subsec. (c). Pub. L. 97-35 added subsec. (c).

EFFECTIVE DATE of 1981 AMENDMENT Amendment by Pub. L. 97-35 effective Aug. 13, 1981, see section 1038 of Pub. L. 97-35, set out as a note under section 6240 of this title.

§ 8422. Compliance report

(a) Generally

Any person owning, operating, or proposing to operate one or more existing electric powerplants required to come into compliance with the prohibitions of this chapter shall on or before January 1, 1980, and annually thereafter, submit to the Secretary a report identifying all such existing electric powerplants owned or operated by such person. Such report shall(1) set forth the anticipated schedule for compliance with the applicable requirements and prohibitions by each such electric powerplant;

(2) indicate proposed or existing contracts or other commitments or good faith negotiations for such contracts or commitments for coal or another alternate fuel, equipment, or combinations thereof, which would enable such powerplant to comply with such prohibitions; and

(3) identify those electric powerplants, if any, for which application for temporary or permanent exemption from the prohibitions of this chapter may be filed.

(b) Report on implementation of section 8484 plan Any electric utility required to submit a conservation plan under section 8484 of this title shall annually submit to the Secretary a report identifying the steps taken during the preceding year to implement such plan.

(Pub. L. 95-620, title VII, § 712, Nov. 9, 1978, 92 Stat. 3332; Pub. L. 97-35, title X, § 1023(b), Aug. 13, 1981, 95 Stat. 617.)

AMENDMENTS

1981-Pub. L. 97-35 designated existing provisions as subsec. (a) and added subsec. (b).

EFFECTIVE DATE OF 1981 AMENDMENT Amendment by Pub. L. 97-35 effective Aug. 13, 1981, see section 1038 of Pub. L. 97-35, set out as a note under section 6240 of this title.

PART C-ENFORCEMENT

§ 8431. Notice of violation; other general provisions (a) Notice of violation

(1) Whenever, on the basis of any information available, the Secretary finds that any person is in violation of any provision of this chapter, or any rule or order thereunder, the Secretary shall issue notice of such violation. Any notice issued under this subsection shall be in writing and shall state with reasonable specificity the nature of the violation.

(2) Paragraph (1) shall not be construed to relieve any person of liability under the other provisions of this chapter for any act or omission occurring before the issuance of notice. (b) Individual liability of corporate personnel

Any individual director, officer, or agent of a corporation who willfully authorizes, orders, or performs any of the acts or practices constituting in whole or in part a violation of this chapter, or any rule or order thereunder, shall be subject to penalties under this section without regard to any penalties to which the corporation may be subject, except that no such individual director, officer, or agent shall be subject to imprisonment under section 8432 of this title, unless he also knew of noncompliance by the corporation or had received from the Secretary notice of noncompliance by the corporation.

(c) Repealed. Pub. L. 100-42, § 1(c)(18), May 21, 1987, 101 Stat. 313

(d) Federal agencies

The provisions of sections 8432 and 8433 of this title shall not be construed to apply to any Federal agency or officer or employee thereof acting in his official capacity.

(Pub. L. 95-620, title VII, § 721, Nov. 9, 1978, 92 Stat. 3333; Pub. L. 100-42, § 1(c)(18), May 21, 1987, 101 Stat. 313.)

AMENDMENTS

1987-Subsec. (c). Pub. L. 100-42 struck out subsec. (c) which read as follows: "No person shall be subject to any penalty under this part with respect to the operation of any powerplant in excess of that allowed by an exemption granted on the basis of the operation of such powerplant as a peakload powerplant if it is demonstrated to the Secretary that such operation was necessary to meet peakload demand and that other peakload powerplants within the same system as such powerplant

"(1) were unavailable for service

"(A) due to unit or system outages; or

"(B) because operation of such other powerplants would result in their exceeding the hours of operation allowed under an exemption; and "(2) have not been operated other than to meet peakload demand."

§ 8432. Criminal penalties

Any person who willfully violates any provision of this chapter, or any rule or order there

under, shall be subject to a fine of not more than $50,000, or to imprisonment for not more than one year, or both, for each violation.

(Pub. L. 95-620, title VII, § 722, Nov. 9, 1978, 92 Stat. 3333; Pub. L. 100-42, § 1(c)(19), May 21, 1987, 101 Stat. 313.)

AMENDMENTS

1987-Pub. L. 100-42 struck out “(other than section 8372 of this title)" after "this chapter".

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in section 8431 of this title.

§ 8433. Civil penalties

(a) General civil penalty

Any person who violates any provision of this chapter, or rule or order thereunder, shall be subject to a civil penalty, which shall be assessed by the Secretary, of not more than $25,000 for each violation. Each day of violation shall constitute a separate violation.

(b) Civil penalty for operation in excess of exemption In the case of any electric powerplant granted an exemption, any person who operates such powerplant during any 12-calendar-month period in excess of that authorized in such exemption, shall be liable for a civil penalty, which shall be assessed by the Secretary. The amount of such civil penalty may not exceed $10 per barrel of petroleum or $3 per Mcf of natural gas used in operation of such powerplant in excess of that authorized in such exemption.

(c) Repealed. Pub. L. 100-42, 81(c)(20)(C), May 21, 1987, 101 Stat. 314

(d) Assessment

(1) Before issuing an order assessing a civil penalty against any person under this chapter, the Secretary shall provide to such person notice of the proposed penalty. Such notice shall inform such person of his opportunity to elect in writing within 30 days after the date of receipt of such notice to have the procedures of paragraph (3) (in lieu of those of paragraph (2)) apply with respect to such assessment.

(2)(A) Unless an election is made within 30 calendar days after receipt of notice under paragraph (1) to have paragraph (3) apply with respect to such penalty, the Secretary shall assess the penalty, by order, after a determination of violation has been made on the record after an opportunity for an agency hearing pursuant to section 554 of title 5 before an administrative law judge appointed under section 3105 of such title 5. Such assessment order shall include the administrative law judge's findings and the basis for such assessment.

(B) Any person against whom a penalty is assessed under this paragraph may, within 60 calendar days after the date of the order of the Secretary assessing such penalty, institute an action in the United States court of appeals for the appropriate judicial circuit for judicial review of such order in accordance with chapter 7 of title 5. The court shall have jurisdiction to enter a judgment affirming, modifying, or set

ting aside in whole or in part, the order of the Secretary, or the court may remand the proceeding to the Secretary for such further action as the court may direct.

(3)(A) In the case of any civil penalty with respect to which the procedures of this paragraph have been elected, the Secretary shall promptly assess such penalty, by order, after the date of the receipt of the notice under paragraph (1) of the proposed penalty.

(B) If the civil penalty has not been paid within 60 calendar days after the assessment order has been made under subparagraph (A), the Secretary shall institute an action in the appropriate district court of the United States for an order affirming the assessment of the civil penalty. The court shall have authority to review de novo the law and the facts involved, and shall have jurisdiction to enter a judgment enforcing, modifying, and enforcing as so modified, or setting aside in whole or in part, such assessment.

(C) Any election to have this paragraph apply may not be revoked except with the consent of the Secretary.

(4) If any person fails to pay an assessment of a civil penalty after it has become a final and unappealable order under paragraph (2), or after the appropriate district court has entered final judgment in favor of the Secretary under paragraph (3), the Secretary shall institute an action to recover the amount of such penalty in any appropriate district court of the United States. In such action, the validity and appropriateness of such final assessment order or judgment shall not be subject to review.

(5)(A) Notwithstanding the provisions of title 28, or of section 7192(c) of this title, the Secretary shall be represented by the general counsel of the Department of Energy (or any attorney or attorneys within the Department of Energy designated by the Secretary) who shall supervise, conduct, and argue any civil litigation to which paragraph (3) of this subsection applies (including any related collection action under paragraph (4)) in a court of the United States or in any other court, except the Supreme Court. However, the Secretary or the general counsel shall consult with the Attorney General concerning such litigation, and the Attorney General shall provide, on request, such assistance in the conduct of such litigation as may be appropriate.

(B) Subject to the provisions of section 7192(c) of this title, the Secretary shall be represented by the Attorney General, or the Solicitor General, as appropriate, in actions under this subsection, except to the extent provided in subparagraph (A) of this paragraph.

(C) Section 7172(d) of this title shall not apply with respect to the functions of the Secretary under this subsection.

(Pub. L. 95-620, title VII, § 723, Nov. 9, 1978, 92 Stat. 3333; Pub. L. 100-42, § 1(c)(20), May 21, 1987, 101 Stat. 313.)

AMENDMENTS

1987-Subsec. (a). Pub. L. 100-42, §1(c)(20)(A), struck out "(other than section 8372 of this title)" after "this chapter".

Subsec. (b). Pub. L. 100-42, § 1(c)(20)(B), (C), struck out "(1)" before "In the case of" and struck out par. (2) which read as follows: "Any person operating a major fuel-burning installation granted an exemption which, for any 12-calendar-month period, uses petroleum or natural gas, or both, in excess of that use allowed by such exemption shall be liable for a civil penalty, which shall be assessed by the Secretary. The amount of such civil penalty may not exceed $10 per barrel of petroleum or $3 per Mcf of natural gas which was used in excess of that use allowed by such exemption."

Subsec. (c). Pub. L. 100-42, § 1(c)(20)(C), struck out subsec. (c) which set forth civil penalties for violation of section 8372 of this title.

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 8411, 8431 of this title.

§ 8434. Injunctions and other equitable relief

Whenever it appears to the Secretary that any person has engaged, is engaged, or is about to engage in acts or practices constituting a violation of this chapter, or any rule or order thereunder, a civil action,1 may be brought, in accordance with section 7192(c) of this title, in the appropriate district court of the United States to enjoin such acts or practices, and, upon a proper showing, the court shall grant, without bond, mandatory or prohibitive injunctive relief, including interim equitable relief. (Pub. L. 95-620, title VII, § 724, Nov. 9, 1978, 92 Stat. 3335.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in section 8411 of this title.

§ 8435. Citizens suits

(a) General rule

Except as otherwise provided in subsection (b) of this section, any aggrieved person may commence a civil action for mandatory or prohibitive injunctive relief, including interim equitable relief, against the Secretary or the head of any Federal agency which has a responsibility under this chapter if there is an alleged failure of the Secretary or such agency head to perform any act or duty under this chapter which is not discretionary. The United States district courts shall have jurisdiction over actions brought under this section, without regard to the amount in controversy or the citizenship of the parties.

(b) Notice to Secretary or agency head

No action may be commenced under subsection (a) of this section before the 60th calendar day after the date on which the plaintiff has given notice of such action to the Sccretary or the agency head involved. Notice under this subsection shall be given in such manner as the Secretary shall prescribe by rule.

(c) Authority of Secretary to intervene

In any action brought under subsection (a) of this section, the Secretary, if not a party, may intervene as a matter of right.

1 So in original. The comma probably should not appear.

(d) Costs of litigation

The court, in issuing any final order in any action brought under subsection (a) of this section, may award costs of litigation (including reasonable attorney and expert witness fees) to any party, whenever the court determines such award is appropriate.

(e) Other remedies to remain available

Nothing in this section shall restrict any right which any aggrieved person (or class of aggrieved persons) may have under any statute or common law to seek enforcement of this chapter or any rule thereunder, or to seek any other relief (including relief against the Secretary or the agency head involved).

(Pub. L. 95-620, title VII, § 725, Nov. 9, 1978, 92 Stat. 3335.)

PART D-PRESERVATION Of ContractuAL

RIGHTS

§ 8441. Preservation of contractual interest (a) Right to transfer contractual interests

(1) If any person receives natural gas, the use of which is prohibited by the provisions of subchapter III of this chapter or any rule or order thereunder, and if such natural gas is received pursuant to a contract in effect on April 20, 1977, between such person and any other person, such person receiving such natural gas may transfer all or any portion of such person's contractual interests under such contract and receive consideration from the person to whom such contractual interests are transferred. The consideration authorized by this subsection shall not exceed the maximum consideration established as just compensation under this section.

(2) Any person who would have transported or distributed the natural gas subject to a contract with respect to which contractual interests are transferred pursuant to paragraph (1) shall be entitled to receive just compensation (as determined by the Commission) from the person to whom such contractual interests are transferred.

(b) Determination of consideration

(1) The Commission shall, by rule, establish guidelines for the application on a regional or national basis (as may be appropriate) of the criteria specified in subsection (e)(1) of this section to determine the maximum consideration permitted as just compensation under this section.

(2) The person transferring contractual interests pursuant to subsection (a)(1) of this section and the person to whom such interests are transferred may agree on the amount of, or method of determining, the consideration to be paid for such transfer and certify such consideration to the Commission. Except as provided in paragraph (4), such agreed-upon consideration shall not exceed the consideration determined by application of the guidelines prescribed by the Commission under paragraph (1).

(3) In the event the person transferring contractual interests pursuant to subsection (a)(1)

of this section and the person to whom such interests are to be transferred fail to agree, under paragraph (2), on the amount of, or method of determining, the consideration to be paid for such transfer, the Commission may, at the request of both such persons, prescribe the amount of, or method of determining, such consideration. Upon the request of either such person, the Commission shall make such determination on the record, after an opportunity for agency hearing. In any such latter case, the determination of the Commission shall be binding upon the party requesting that such determination be made on the record of the agency hearing. The consideration prescribed by the Commission shall not exceed the maximum consideration permitted as just compensation under this section. In prescribing the amount of, or method of determining, consideration under this paragraph, to the maximum extent practicable, the Commission shall utilize any liquidated damages provision set forth in the applicable contract, but in no event may the Commission prescribe consideration in excess of the maximum consideration permitted as just compensation under this section.

(4) In the event that the consideration agreed upon under paragraph (2) exceeds the consideration determined by application of the guidelines prescribed by the Commission under paragraph (1), the Commission may approve such agreed-upon consideration if the Commission determines such agreed-upon consideration does not exceed the maximum consideration permitted as just compensation under this section.

(5) If consideration is agreed upon under paragraph (2) and such consideration exceeds the consideration determined by application of the guidelines prescribed under paragraph (1), but does not exceed the maximum consideration permitted as just compensation under this section, the Commission may not require a refund of any portion of the agreed-upon consideration paid with respect to deliveries of natural gas occurring prior to the Commission's action under paragraph (4) approving or disapproving such consideration unless the Commission determines

(A) such agreed-upon consideration was fraudulently established;

(B) the processing of the request for approval of such agreed-upon consideration under paragraph (4) was willfully delayed by a party to the transfer; or

(C) such agreed-upon consideration exceeds the maximum consideration permitted as just compensation under this section.

(c) Restrictions on transfers unenforceable

(1) Any provision of any contract, which prohibits any transfer authorized by subsection (a)(1) of this section or terminates such contract on the basis of such transfer, shall be unenforceable in any court of the United States and in any court of any State.

(2) No State may enforce any prohibition on any transfer authorized by subsection (a)(1) of this section.

(d) Contractual obligations unaffected

The person acquiring contractual interests transferred pursuant to subsection (a)(1) of this

section shall assume the contractual obligations which the person transferring such contractual interests has under such contract. This subsection shall not relieve the person transferring such contractual interests from any contractual obligation of such person under such contract if such obligation is not performed by the person acquiring such contractual interests.

(e) Definitions

For purposes of this section

(1) The term "just compensation", when used with respect to any transfer of contractual interests authorized by subsection (a)(1) of this section, means the maximum amount of, or method of determining, consideration which does not exceed the amount by which

(A) the reasonable costs (excluding capital costs) incurred, during the remainder of the period of the contract with respect to which contractual interests are transferred under subsection (a)(1) of this section, in direct association with the use of a fuel, other than natural gas, as a primary energy source by the applicable existing electric powerplant, exceed

(B) the price of natural gas under such contract during such period.

For purposes of subparagraph (A), the reasonable costs associated with the use of a fuel, other than natural gas, as a primary energy source shall include an allowance for the amortization, over the remaining useful life, of the undepreciated value of depreciable assets located on the premises containing such electric powerplant, which assets were directly associated with the use of natural gas and are not usable in connection with the use of such other fuel.

(2) The term "just compensation", when used with respect to subsection (a)(2) of this section, means an amount equal to any loss of revenue, during the remaining period of the contract with respect to which contractual interests are transferred pursuant to subsection (a)(1) of this section, to the extent such loss (A) is directly incurred by reason of the discontinuation of the transportation or distribution of natural gas resulting from the transfer of contractual interests pursuant to subsection (a)(1) of this section, and (B) is not offset by revenues derived from other transportation or distribution which would not have occurred if such contractual interests had not been transferred.

(3) The term "contractual interests", with respect to a contract described in subsection (a)(1) of this section, includes the right to receive natural gas as affected by any applicable curtailment plan filed with the Commission or the appropriate State regulatory authority.

(4) The term "State" means each of the several States, the District of Columbia, Puerto Rico, any territory or possession of the United States, and any political subdivision of any of the foregoing.

(5) The term "interstate pipeline" means any person engaged in the transportation of natural gas in interstate commerce subject to the jurisdiction of the Commission under the Natural Gas Act [15 U.S.C. 717 et seq.).

(6) The term "Commission" means the Federal Energy Regulatory Commission.

(7) The term "contract", when used with respect to a contract for receipt of natural gas, which contract was in existence on April 20, 1977, does not include any renewal or extension occurring after such date unless such renewal or extension occurs pursuant to the exercise of an option by the person receiving natural gas under such contract.

(f) Coordination with Natural Gas Act

(1) Consideration paid by any interstate pipeline pursuant to this section shall be deemed just and reasonable for purposes of sections 4, 5, and 7 of the Natural Gas Act [15 U.S.C. 717c, 717d, 717f]. The Commission shall not deny a passthrough by such interstate pipeline of such consideration based upon the amount of such consideration paid pursuant to this section.

(2) No person shall be subject to the jurisdiction of the Commission under the Natural Gas Act [15 U.S.C. 717 et seq.] or to regulation as a common carrier under any provision of Federal or State law solely by reason of making any sale, or engaging in any transportation, of natural gas with respect to which the transfer of contractual interests is authorized under subsection (a)(1) of this section.

(3) Nothing in this section shall exempt from the jurisdiction of the Commission under the Natural Gas Act [15 U.S.C. 717 et seq.] any transportation in interstate commerce of natural gas, any sale in interstate commerce for resale of natural gas, or any person engaged in such transportation or such sale to the extent such transportation, sale or person is subject to the juridiction of the Commission under such Act without regard to the transfer of contractual interests under subsection (a)(1) of this section.

(4) Nothing in this section shall exempt any person from any obligation to obtain a certificate of public convenience and necessity for the transportation by an interstate pipeline of natural gas with respect to which the transfer of contractual interests is authorized under subsection (a)(1) of this section. The Commission shall not deny such a certificate for the transportation in interstate commerce of natural gas based upon the amount of consideration paid pursuant to this section.

[blocks in formation]

(3) the volume which would have been delivered, or for which payment would have been made, pursuant to such contract but for the prohibition on the use of such natural gas under subchapter III of this chapter or any rule or order thereunder; and

(4) the volume actually delivered or for which payment would have been made pursuant to such contract during the 12-calendarmonth period ending immediately before such transfer of contractual interests pursuant to this section.

(h) Judicial review

Any action by the Commission under this section is subject to judicial review in accordance with chapter 7 of title 5.

(Pub. L. 95-620, title VII, § 731, Nov. 9, 1978, 92 Stat. 3336; Pub. L. 100-42, § 1(c)(21), May 21, 1987, 101 Stat. 314.)

REFERENCES IN TEXT

The Natural Gas Act, referred to in subsecs. (e)(5) and (f)(2), (3), is act June 21, 1938, ch. 556, 52 Stat. 821, as amended, which is classified generally to chapter 15B (§ 717 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see section 717w of Title 15 and Tables.

AMENDMENTS

1987-Subsec. (a)(1). Pub. L. 100-42, § 1(c)(21)(A), struck out reference to subchapter II of this chapter. Subsec. (e)(1). Pub. L. 100-42, § 1(c)(21)(B), struck out "or major fuel-burning installation" after "powerplant" in subpar. (A) and "or major fuel-burning installation" after "powerplant" in last sentence. Subsec. (g)(3). Pub. L. 100-42, § 1(c)(21)(A), struck out reference to subchapter II of this chapter.

PART E-STUDIES

§ 8451. National coal policy study (a) Study

The President, acting through the Secretary and the Administrator of the Environmental Protection Agency, shall make a full and complete investigation and study of the alternative national uses of coal available in the United States to meet the Nation's energy requirements consistent with national policies for the protection and enhancement of the quality of the environment and for economic recovery and full employment. In particular the study should identify and evaluate—

(1) current and prospective coal requirements of the United States;

(2) current and prospective voluntary and mandatory energy conservation measures and their potential for reduction of the United States coal requirements;

(3) current and prospective coal resource production, transportation, conversion, and utilization requirements;

(4) the extent and adequacy of coal research, development, and demonstration programs being carried out by Federal, State, local, and nongovernmental entities (including financial resources, manpower, and statutory authority);

(5) programs for the development of coal mining technologies which increase coal pro

« PreviousContinue »