Space station, OMSF-Continued Crew/General Purpose Lab.: Current status_. Decisions/decision dates, fiscal years 1971/1972. Definition studies_ Description Earth surveys attached-mode module: Chart Review Design verification activities: Earth surveys module (detached), diagram__. Recipient, nature of expenditure and cost, fiscal years Funding requirements, graph_ Initial Space Station (ISS) buildup, charts. Graphs Program options___ Materials science and manufacturing, diagram.. Modular concepts: Advantages Contractor studies_ Page 97 258,259 RAM applications: Chart 1086 Review 1085 Growth Space Station (GSS) buildup sequence, charts-- 177, 257 184 177, 256 99 178 178, 257 172 1185 132, 532 251 Artist's conception--- 92 92 92 101 1183, 1184 259 1074 1073 Diagram In-house studies__. 87,90 Modular space station vs 33-foot station, charts____ 174, 253 172, 253 175, 254 175, 255 100 172, 251 84-87 87 175 87 89 176, 254 89 172, 253, 255 87 180, 258 90 121 Saturn V launch vehicle utilization. Spacecraft programs planning, graph___ Subsystem summary, chart_ Utilization planning--. General Dynamics operations: Centaur orbit to orbit shuttle (OOS). Chart___ Review Water and waste management group, chart. Space suits. (See spacesuits and life support systems.) Mission arena: Review Orbit-to-orbit traffic: Chart Program elements: Review Program elements_ Page 120, 121 94 534 Space Transportation Systems (STS) Committee, AF/NASA: Space tug (LM-B) (see also Orbit-to-Orbit Shuttle (OOS)): Chemical design_---- Function 90, 132, 133 92 175, 178, 532 532 OOS/space tug key events: Chart 84 156, 222 94 179 84, 87 93 1025 1054, 1056 1053, 1055 1034 1033 1042 1041 1028 1027 289, 290 81, 1186 118, 119 484-487 535 536 234 1040 1039 1032 1031 1036, 1038 1035, 1037 1052 1051 Space tug (LM-B)-Continued Payload retrieval capability. Chart Space station atmosphere purification/water reclamation__ Chart Sperry Rand Corp. Phoenix, Ariz.: Space shuttle Phase B subcontract SSB. (See Space Science Board (SSB), NAS.): SSME. (See Space shuttle, OMSF/Main Engine (SSME).): Space station conference attendance_ Stellar astronomy: Payload/experiment definition.. Stratoscope 11 project: Project review. STS. (See Space Transportation System (STS).): Cancellation Space shuttle relationship. Support service contracts: Manned space flight program. Page 119 487-491 535 110 111 112 110 110 109 92 111 109, 110 417 84 96, 97 509, 511 314 250 123, 124 704 2 290, 291 757-764 291-293 765-769 729-731 729 114 114 115 114 Telescopes (see also Apollo Telescope Mount (ATM); Large Thompson Ramo Wooldridge (TRW), Inc. (See TRW Sys- Aerojet Liquid Rocket Co. operations: Products improvement.. Capability Space shuttle applications... Top of Alabama Council of Governments: TPS (See Space shuttle, OMSF/Thermal Protection System Tracking and data acquisition program, OTDA (See Antennas; Tracking stations (See Goldstone, Calif. tracking station.) Page 137,207 648, 649 652, 653 290, 291 7 284 Photograph Particles and fields subsatellite, drawing- 422 426 422 426 511 397, 403, 404 385, 415 392 382-385 383 384 388 384 386 417 380-382 381 398, 419 Task summary, Houston operations, chart. Space shuttle booster. Cooperation with General Dynamics/Convair: Current manned systems related studies, chart. DSCS, Phase II: Description Earth orbiting manned experiments study. 398,419 388 408 376 375 398, 419 374 TRW Systems Group, Redondo Beach, Calif.-Continued Cooperation with General Dynamics/Convair, Phase Description KSC support activities. Chart Data analysis lag Manned missions support activities. Manned space objectives, chart_. Manpower reduction.. Mission Control Center, Houston, photograph__ MSC support activities.. Operations: Description Pioneer F: Jupiter spacecraft, photograph_-- Political-economic obstacles_. Signal Data Modulator Systems applications__. Skylab program: Subcontracts Page 398, 419 399, 420 398, 419, 420 398, 420 399 359, 360, 364, 366, 411 365 364 365 385, 386 379 376-379 376 377 378 375 374 375 390, 401, 402, 416 414, 415 389 363 383 382, 416 363, 412, 413 372 371 360 360, 361, 411 367 366 408,409 361-363 415 208, 387, 415 387 366, 414 389, 416 388 404-406 |