Page images
PDF
EPUB

General Dynamics/Convair-Continued

Space Transportation System (SST)-Continued
Space shuttle/00S mission integration:

Chart

Review

Space tug/00S budgetary phasing relationship:
Chart

Review

Space tug/00S mission model comparison:

Chart
Review

Space vehicle development:

Chart

Review

Systems considered for 00S applications:

Chart
Review

General Electric Co.:

Engineering support phaseout....
Space shuttle technology:

Reusable external insulator studies__

Geological Survey, U.S.:
Cooperation with NASA:

Mississippi Test Facility use..

George C. Marshall Space Flight Center, Huntsville, Ala.:
ACE system utilization__.

AM structural qualification tests.
Astronautics Laboratory:

Contractor support consolidation_
ATM manufacturing/testing.
ATM vibration test unit:

Experiment
graph
Capital assets:

Chart

Review

Clean Room:

ATM prototype unit installation, photograph‒‒‒‒‒
Communications/navigation program:

Goals

Research laboratory:

Chart
Purpose

package/cannister mating, photo

Computation Laboratory:
Computer purchase.
Construction of facilities:

[blocks in formation]

Page 1030

1029

1050

1049

1036, 1038

1035, 1037

905

904

1046

1045

123

321

127

1179

48

124

48

53

510

509

56

528

528 528

127

134

1189, 1190

1190

509

509

740

George C. Marshall Space Flight Center-Continued
Earth resources data applications.

HEAO program:

Design characteristics
Missions plans
Objectives

Phase B definition studies.
Program management
Spacecraft configuration
Leased computers purchase..
Master schedule, chart-

Materials science and manufacturing in space:

Biological preparations

Crystal growth

Laboratory:

Configuration, chart
Review

[blocks in formation]

Astronaut maneuvering equipment-
ATM contamination measurement_.
ATM experiments

Body mass measurement_

Chart

Page

511

EREP support equipment_
Exothermic heating task...
Expendable airlock technology
Foot controlled maneuvering unit.

521

520

520

520

509, 520, 521 520, 521

127

520

529

529

531

530

529

528, 529

44, 48

505

505, 506

507, 508 506, 507

126 123, 507 507

1196, 1197

511-513

516, 546

515

515

515, 518

582, 583

614, 615

644, 645 574, 575

Composite casting task____

517 604, 605

Coronagraph contamination measurement---- 612, 613

Crew/vehicle disturbance
Delineation, charts

584, 585

552, 553

642, 643

600, 601 588,589

586,587

George C. Marshall Space Flight Center-Continued
Skylab program-Continued
Experiments Continued

Galactic X-ray mapping--
Gegenschein/zodiacal light...
Gravity substitute workbench.
Human vestibular function_.
In-flight aerosol analysis..
In-flight body pressure.
Infrared spectrometer_
Introduction

[blocks in formation]
[blocks in formation]

George C. Marshall Space Flight Center-Continued
Skylab program-Continued
Saturn IB launch vehicle:
Configuration, chart_

Schedules

Scope

Workshop mockup:

Forward compartment, photograph__
Work area, photograph_--

Skylab workshop:
System testing-
Slidell Computer Facility:
Computer purchase_
Space shuttle:

Applications areas__

Launch configuration..

MDAC Phase B study management_

Objectives

Payload delivery capabilities.
Propulsion system---

525-527

Attitude control engine prototype test site-------- 397, 419
Contractor team management_
Contractual responsibility.
Cost reduction factors..
Critical technology areas_-
Data management system_.
International involvement.
Justification

523 81 523, 524

525

525

525

535

525

392,417 524

533, 535

Sortie mode__

Thermal protection system..

Vehicle Systems Integration Activity operations__.
Space station:

Configuration:

Chart

Review

[blocks in formation]

Page

544

518

515

548

549

44

127

524

530

525

523

533

87,532

532

532

532

535

536

535

50, 511

508 124

. 123, 124

507,509

114

704 168, 525

Goodard Space Flight Center, Greenbelt, Md.:
HEAO tracking and data acquisition.
OAO manpower staffing, chart..
Goldstone, Calif. tracking station:
Pioneer F tracking responsibility-.
Grand Tour missions:

North American Rockwell Corp. preparation__.
Spacecraft, illustration___.

Gravity:

Tidal gravimeter:

Gravitational waves detection__.

Great Britain:

Cooperation with U.S.:

Skynet II communications satellite plans.
Space shuttle_

Grumman Aerospace Corp., Bethpage, N.Y.:
ACE systems__.
Achievements

Cold Flow Facility.

Cooperation with Boeing Co.:

Space shuttle studies..

E-2C aircraft__

Extra systemic organ transporter, photograph.
F-14 profile--‒‒‒

Gulfstream II aircraft description.

HEAO program:
Participation

TRW Systems Group competitive study
LM program:

Bethpage manpower staffing, graph_.
Cost, calendar year, graph.

Cost, fiscal year, graph.
Highlights

Total manpower staffing, graph__.
Vehicle status, chart.

LST potential..

Mobile Intensive Care Operating Table (MICOT).

OAO program:

Malfunction, cost estimate..
Manpower staffing, charts_
Organizational structure_.
Personnel:

Organization, chart__.
Responsibilities breakdown..
Responsibilities, chart..
Principle design configurations:
Cost estimates, graphs..
Space shuttle:

Activity split, chart_.

Boeing Co. cooperation..

Booster studies conclusions, chart_.

Concept studies___

Page

509

1129

368

287-289 289

4

704

168, 245, 525

1179 1109

1120

724, 1135

1114

1151

1113

1113

1133-1135

376

1122

1124

1125

1115

1120

1114, 1115

1133

1152

401

1128

1109

1110

1109

1110

1144

1139

724, 1135

1145 81

« PreviousContinue »