Page images
PDF
EPUB

Demarest, David-Continued
General testimony-Continued
TRW Systems Group-Continued
Space shuttle-Continued
Integrated avionics__
Propulsion systems.
Satellite repair/maintenance application__-
Site selection..

Unmanned satellite applications.

Prepared statement_
TRW Systems..

[ocr errors]

Space program support..

Dorrenbacher, C. James:
General testimony:

Experiment module concepts study--.
Objectives
Space shuttle__

McDonnell Douglas Astronautics Co.:
Laser communications____
Space shuttle:

Space systems advance technology:

Insulation

Elchison, Nick R.:

Man-computer control...
Ten years of study___.

E

267

240

250

274

Air breathing engines use.
Commercial applications..
Delta/Scout comparison.
Delta significance...
Drop vehicle configuration__.
Flight testing--

273, 274

236

238

249

Funding limitation/decisionmaking.
Landing site-‒‒‒‒

236

North American program comparison.

275

Space transportation system relationship. 249, 250
Space station:

Design, pre-Saturn V halt...
Funding

Skylab hardware use.

Prepared statement..

Space Division, Chrysler Corp..
Michoud Assembly Facility.

Manufacturing building layout...
Resources

Site plan...

Shuttle booster..

Page 392-395

395-398

Concept

Manufacturing breakdown..
Work for General Dynamics/Convair.

405

401, 402

399-401

416-420

__416-420

416-420

419-420

416 416-420

253

258

255

264

272

259,260

740-745 740-745

742, 744, 745

745

742

744

741, 743

741

743

742, 743

[blocks in formation]

Burke, Walter F.:

General testimony:

General testimony:

North American Rockwell Corp./Rocketdyne Div.:
Space program:
Decline effects
Support
Space shuttle:
Significance

McDonnell Douglas Astronautics Co.:
Advanced technology
Laser communications

Skylab program:

Experiment selection base.

[ocr errors]

Status

Vehicle refurbishing

Space program:

Activities review
Funding level
Space shuttle:

Page

368, 379, 405

Cross range capability.
Flight testing
MOL comparison_.
NASA budget request---
Phase B contract.
Production timetable
Wing design

Space transportations system interest_

[ocr errors][merged small][merged small][merged small]

340-342 339, 340

342, 343

259 267

228 206

225

205, 206

206

240

237, 238

249 244

243, 249

242 247

250

Camp, Hon. John N. Happy:
Inquiries:

[ocr errors]

Lockheed Missiles and Space Co.:
Intelsat V.:

T

TRW Systems Group:
Design review role...

Castenholz, P. D.:
General testimony:

C

Coughlin, Hon. R. Lawrence:
Inquiry:

TRW Systems Group:

U.S.S.R. cooperation
Space shuttle:

Cryogenic optimization technology.
Engine size, fuel factor____
Thermal protection materials.
McDonnell Douglas Astronautics Co.:
Space shuttle:

Horizontal flight testing.

LM descent engine development_
Space shuttle:

Launch site selection analysis..

[ocr errors]
[blocks in formation]
[ocr errors]

North American Rockwell Corp./Rocketdyne Division:
Space shuttle:

Engine development/design.
Status --

Test program_

[ocr errors]

Vela spacecraft, system monitoring.

D

Prepared statement__

McDonnell Douglas Astronautics Co.:
Space station:

Configuration review.
Cost estimates__.
Description

Guidelines/constraints changes:
Options review...
System study conclusion.

Internal arrangement.
Modular build-up..

Program options.
Subsystems
Support review.

McDonnell Douglas Astronautics Co..
Space station___.
Configuration

[ocr errors]
[ocr errors]

Page

494

466

465

464

236

382

382

402

344-351

343, 344 351-358

373

251 258 255-257 253 253-255 258 1172-180 172-180

172-180

4 172-174

178 175-178 175 178, 179 172

[blocks in formation]

General testimony:

[ocr errors]

TRW Systems Group:

Orbiting Astronomical Observatory (OAO):
Financial loss_____.

Space shuttle:

Auxiliary propulsion system contract

Page

699-711

699-711

699-702

support.

Experiment module concepts---

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

competition

Data bus concept------

Disposable booster engine---

Engineering, mission operations and launch

371

411-413 411-413 411, 412

411, 412

401

402

393, 395

403, 404

390-392 398, 399

Demarest, David-Continued
General testimony-Continued
TRW Systems Group-Continued
Space shuttle-Continued
Integrated avionics...
Propulsion systems.
Satellite repair/maintenance application----
Site selection_..

Unmanned satellite applications-
Prepared statement..
TRW Systems_.

Space program support_

Experiment module concepts study.
Objectives
Space shuttle_

Dorrenbacher, C. James:
General testimony:

McDonnell Douglas Astronautics Co.:
Laser communications___
Space shuttle:

[blocks in formation]

Air breathing engines use_-
Commercial applications_
Delta/Scout comparison..
Delta significance_
Drop vehicle configuration..
Flight testing....

238

249

Funding limitation/decisionmaking-
Landing site____.

236

North American program comparison-

275

Space transportation system relationship. 249, 250
Space station:

Design, pre-Saturn V halt_
Funding

Skylab hardware use_-
Space systems advance technology:

Insulation

Space Division, Chrysler Corp.
Michoud Assembly Facility.

Manufacturing building layout---
Resources

Site plan-

Shuttle booster..

Page 392-395

395-398

Concept

Manufacturing breakdown.---
Work for General Dynamics/Convair_.

405

401, 402

399-401

416-420

-416-420

416-420

419-420

416 416-420

267

240

250

274

273, 274

236

253

258

255

264

272

259,260

740-745 740-745

742, 744, 745

745

742

744

741, 743

741

743

742, 743

« PreviousContinue »