Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ...U.S. Government Printing Office, 1930 - 132 pages |
From inside the book
Results 1-5 of 30
Page
... Removal of downstream cofferdam 19 and rock barrier----------------- 20 58. Common excavation for foundations of dam, power house, and cofferdams-- 20 59. Rock excavation for foundation of dam---------------------------- 21 | 60 ...
... Removal of downstream cofferdam 19 and rock barrier----------------- 20 58. Common excavation for foundations of dam, power house, and cofferdams-- 20 59. Rock excavation for foundation of dam---------------------------- 21 | 60 ...
Page 1
... Removal of earth |230,000 cu. yds., at ----------------------------- fill in downstream cofferdam. (Words) ... Removal of rock fill 191,000 cu. yds., at ----------------------------- in downstream cofferdam and (Words) rock barrier ...
... Removal of earth |230,000 cu. yds., at ----------------------------- fill in downstream cofferdam. (Words) ... Removal of rock fill 191,000 cu. yds., at ----------------------------- in downstream cofferdam and (Words) rock barrier ...
Page 13
... removal by him or by his employees, they will be replaced by the contracting officer at the contractor's expense, and his sureties shall be liable therefor. - 8. Data to be furnished by contractor. The contractor shall furnish the ...
... removal by him or by his employees, they will be replaced by the contracting officer at the contractor's expense, and his sureties shall be liable therefor. - 8. Data to be furnished by contractor. The contractor shall furnish the ...
Page 14
... removed by the Government at the expense of the contractor, and his surety or sureties shall be liable therefor. . . . . 12. Failure of Congress to appropriate funds.-If the operations of this contract extend beyond the current fiscal ...
... removed by the Government at the expense of the contractor, and his surety or sureties shall be liable therefor. . . . . 12. Failure of Congress to appropriate funds.-If the operations of this contract extend beyond the current fiscal ...
Page 24
... removed by the contractor within six months from the date of final acceptance of the work, subject to the supervision and approval of the contracting officer: And provided further, That if such improvements are not so removed by the ...
... removed by the contractor within six months from the date of final acceptance of the work, subject to the supervision and approval of the contracting officer: And provided further, That if such improvements are not so removed by the ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...