Specifications, Schedule, and Drawings: Hoover Dam, Power Plant and Appurtenant Works. Boulder Canyon Project. Arizona-California-Nevada ...U.S. Government Printing Office, 1930 - 132 pages |
From inside the book
Results 1-5 of 52
Page 14
... placed downstream from the downstream cofferdam and will consist of a massive embankment of dumped rock. The four diversion tunnels will be circular in cross-section, lined with concrete and 50 feet in diameter inside of the lining. Two ...
... placed downstream from the downstream cofferdam and will consist of a massive embankment of dumped rock. The four diversion tunnels will be circular in cross-section, lined with concrete and 50 feet in diameter inside of the lining. Two ...
Page 15
... placed and after the setting heat has been dissipated, the joints will be filled with grout under pressure. The setting heat will be reduced by means of a refrigeration plant Supplying and forcing cooled water through 2-inch pipes ...
... placed and after the setting heat has been dissipated, the joints will be filled with grout under pressure. The setting heat will be reduced by means of a refrigeration plant Supplying and forcing cooled water through 2-inch pipes ...
Page 19
... placed in the Regular Army or Navy Reserve, and second, to qualified citizens of the United States. 24. Commencement, prosecution, and completion of work.-The contractor shall begin work within thirty (30) calendar days after date of ...
... placed in the Regular Army or Navy Reserve, and second, to qualified citizens of the United States. 24. Commencement, prosecution, and completion of work.-The contractor shall begin work within thirty (30) calendar days after date of ...
Page 24
... placed thereon shall be removed by the contractor within six months from the date of final acceptance of the work, subject to the supervision and approval of the contracting officer: And provided further, That if such improvements are ...
... placed thereon shall be removed by the contractor within six months from the date of final acceptance of the work, subject to the supervision and approval of the contracting officer: And provided further, That if such improvements are ...
Page 28
... placed in the Government warehouse which will be located at the end of the construction railroad. Payment for unloading and placing such materials will be made to the contractor at the unit price bid under item 116 of the schedule. The ...
... placed in the Government warehouse which will be located at the end of the construction railroad. Payment for unloading and placing such materials will be made to the contractor at the unit price bid under item 116 of the schedule. The ...
Common terms and phrases
acceptance accordance additional adits amount approved bars bond cement cleaned cofferdam completed concrete conduit connection construction contracting officer contractor covered damage DEPARTMENT deposits described determined directed diversion tunnels downstream drawings drilled elevator equipment excavation expense face feet finished fittings floor Flow Breccia forms foundation furnished gates Government gravel grout gunite handling hauling highway hoists holes inch inclined include the cost installing intake towers joints length less lining located manner materials measured metal necessary º º operation otherwise outlet paint paragraph paragraph 27 payment permitted pipe placed plant plates plugs portions pounds power house pressure protection provided in paragraph provisions of paragraph railroad removed river rock sand satisfactory schedule shafts shown side specifications spillway square standard steel structures sufficient suitable surface therefor thickness tile unit prices bid upstream valves yard
Popular passages
Page 30 - The property shall be returned in as good condition as when received, reasonable wear and tear excepted.
Page 19 - That all persons who hav.e served in the United States Army, Navy, or Marine Corps during the war with Germany, the war with Spain, or in the suppression of the insurrection...