DISAPPROVED

[blocks in formation]

DESCRIPTION

Put an incentive clause in contracts for completing ahead of schedule.

Not recommended

Review wrap-up insurance to reward a contractor with a good safety record and penalize one with

UNPRICED

a poor record. Recommended in principle

Encourage action to eliminate sales taxes and permit fees.

Eliminate station entrances where more than one entrance is planned.

DISAPPROVED

[ocr errors]
[blocks in formation]

Add columns under platforms and tracks in mezzanines of above-grade stations.

study complete Feb 5 (along with station box study)

Delete re-heat electric heaters in station

air conditioning. Recommend approval

Liberalize provisions for payment for materials

and equipment. Not recommended

REMARKS

COST RANGE

studying in connection with similiar investigation of incentives for reducing damage claims

Alternative is to postpone construction of additional entrance until patronage clearly justifies it. Opportunity for this reduction now restricted to Shaw Station. Cleveland Park, Van Ness and Tenley Circle

Stations are under constettem

another

[blocks in formation]

Reduction of beam span length possible with study on station by station basis. circulation is a consideration.

M

Patron

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

APPROVED

DESCRIPTION

Reduce requirements for UPS system.

2 APPROVED

"APPROVED"!

iminate loop track at Greenbelt Yard. Eliminate loop track at Glenmont Yard.

Eliminate Naylor Road pocket track.

Use single story at-grade substations in lieu of two-story.

Relax requirement of pre-bored holes for piles in selected areas.

"APPROVED APPROVED APPROVED APPROVED APPROVED and "APPROVED

Review sizes of ancillary rooms at station
yard buildings.

Discontinue use of boro-silicate for duct
insulation.

Use standard gauge metal for ductwork.

REMARKS

Present UPS system requires 3 hours UPS
duration; this could be reduced to a lesser
duration above grade; also spare capacity
may be reduced.

[blocks in formation]

COST RANGE

[blocks in formation]
[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

Reduce 4 inch topping on platform slabs at
surface stations.

APPROVED
APPROVED
APPROVED
APPROVED.

Relax the design requirement of standard box

girders.

Substitute A-36 for A-242 steel for safety walk

gratings.

Utilize galvanized steel pipe condults Initially
for relocation of underground power cables.

Reduce spare electrical capacity.

"APPROVED "APPROVED1edu APPROVED DU

Eliminate standby chilled water and condenser

pumps.

Use standard adjustable pipe supports.

REMARKS

Required only in wet locations.

COST RANGE

$250,000

Permitted via climination of heating cables.

$250,000

Revise design criteria to permit other types
of girders.

$250,000

Relax criteria to allow less expensive
material.

$250,000

Could eliminate the requirement for a
temporary enclosure and later construction
of permanent ducts and cables.

$250,000

Since power requirements are now Identified,
spare capacity could be reduced.

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small]

DD-M-17 requires pre-packaged drainage pumping system. Interim pumps may be adequate and could be left in place.

COST RANGE

[blocks in formation]

Ancillary space would not be required for these units.

$150,000

Since cooling towers are not used in winter, these tanks can be eliminated.

$150,000

It is more economical than the present float system which requires running water lines from chiller room to cooling tower. Exact loading will not be known until operation is actually started.

[blocks in formation]
[blocks in formation]

APPROVED

19.

DESCRIPTION

Eliminate pre-packaged drainage pumping

(Continued)

systems. Objective met by using permanent pumps at all times

[blocks in formation]

APPROVED APPROVED APPROVED

21

22.

APPROVED

23.

APPROVED

24.

APPROVED

Substitute roof-top air conditioning units for interior units at surface stations. Delete sump storage tanks In cooling towers.

tower.

Use electric water level control for cooling

Revise air balance specification requirements and eliminate those not practicable until operational load exists.

Reduce the number of concrete construction
joints in subway structures where possible.

12

$150,000

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

COST RANGE

[blocks in formation]

Present specifications require use of
extra heavy cast iron soll pipe underground.

$50,000

Electric controls could be used in lieu of
pncumatic controls In station service
rooms, traction power substations and
other small systems.

$50,000

[blocks in formation]

DESCRIPTION

Substitute concrete for 12" X 12" granite sets
to protect sloped surface at station entrances.

[blocks in formation]

Delete painting of galvanized ductwork in mechanical equipment rooms.

APPROVED
APPROVED
APPROVED
APPROVED
BISAPPROVED
APPROVED
APPROVED

30.

31.

32.

Standardize pile bonding.

Use tube axial fans in lieu of yane axial fans.

Tube axial fans found to take more power

Reduce door heights to 7'-0" where possible.

Use service weight cast iron soll pipe, except
where Loading precludes"

APPROVED

Substitute electric controls for pneumatic
controls where possible.