Government. Requests from non-Government sources for information from performance reports shall be processed in accordance with EPA's Freedom of Information Act procedures at 40 CFR part 2.

[49 FR 8863, Mar. 8, 1984, as amended at 59 FR 18977, Apr. 21, 1994]

1536.209 Construction contracts with architect-engineer firms.

(a) The provisions of FAR 36.209 do not apply to subcontractors performing treatability studies.

(b) The provisions of FAR 36.209 also do not apply to subcontractors whose input during the design phase does not substantially affect the course of the design work.

(c) Approval under FAR 36.209 is not required for subcontractors under paragraph (a) or (b) of this section. Approval for all other subcontractors and prime contractors may be granted by the CCO. In reviewing requests for approval, the RAD shall consider factors such as the availability of other firms to perform the necessary construction or Superfund remedial action work, the estimated cost to the Government, and the policy of the Agency to promote the use of innovative technology.

[55 FR 49283, Nov. 27, 1990, as amended at 59 FR 18977, Apr. 21, 1994]

Subpart 1536.5-Contract Clauses

1536.521 Specifications and drawings for construction.

The Contracting Officer shall insert the clause at 1552.236-70, Samples and Certificates, in soliciations and contracts when a fixed price construction contract is expected to exceed the small purchase limitation. The clause may be inserted in solicitations and contracts when the contract is expected to be within the small purchase limitation.

Subpart 1536.6-Architect-
Engineer Services

1536.602 Selection of firms for architect-engineer contracts.

1536.602-2 Establishment of evaluation boards.

(a) The Environmental Protection Agency Architect-Engineer Evaluation Board is established as a central permanent Board located at Headquarters EPA under authority delegated to the Director, Office of Acquisition Management. The Board shall perform all architect-engineer evaluations on an agency-wide basis. The Agency Board shall be composed of not less than three nor more than five voting members and one non-voting advisory member from the contracting office. The following constitutes the minimum composition of the Architect-Engineer Evaluation Board:

(1) Member and Chairperson. Chief, Engineering, Planning, and Architecture Branch, Facilities Management and Services Division or his/her designee;

(2) Member. A professional engineer or architect from EPA to be designated by the Chairperson;

(3) Member. A program official initiating the requirement or a designated representative; and

(4) Advisory Member. A Contracting Officer or his/her representative.

(b) The Chief of the Contracting Office (CCO) is delegated the authority to appoint either one or two additional voting members as may be appropriate for a particular project.

(c) In the event of an emergency or extended absence, a member may designate, in writing, with the concurrence of the Chairperson, an alternate experienced in architecture, engineering, or construction to serve in his/her absence.

(d) The duties of the advisory member shall include, but not be limited to, the following:

(1) Assuring that the criteria set forth in the public notice are applied in the evaluation process; and

[blocks in formation]

Direction, in cost-reimbursement type solicitations and contracts.

(c) The Contracting Officer shall insert the clause at 1552.237-72, Key Personnel, in solicitations and contracts when it is necessary for contract performance to identify Contractor key personnel.

(d) The Contracting Officer shall insert the clause at 1552.237-73, Consultant Services and Consent, in solicitations and contracts where the services of consultants are required.

(e) The Contracting Officer shall insert the clause at 1552.237–74, Publicity, in solicitations and contracts pertaining to the removal or remedial activities under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA).

(f) The Contracting Officer shall insert the clause at 1552.237-75, Paperwork Reduction Act, in solicitations and contracts requiring the collection of identical information from (10) or more public respondents.

(g) To ensure that Agency contracts are administered so as to avoid creating an improper employer-employee relationship, contracting officers shall insert the contract clause at 48 CFR 1552.237-76, "Government-Contractor Relations", in all solicitations and contracts for non-personal services that exceed the simplified acquisition threshold.

[49 FR 8864, Mar. 8, 1984, as amended at 64 FR 30444, June 8, 1999]

194-198 D-01--3

[blocks in formation]

1542.705 Final indirect cost rates.

(a) The EPA shall use the Contracting Officer determination procedure for all business units for which it shall be required to negotiate final indirect cost rates.

(b) Contracting officers shall insert the clause at 1552.242-72, Financial Administrative Contracting officers (FACO), in cost-reimbursement contracts when the Environmental Protection Agency (EPA) is the cognizant federal agency and a FACO will be assigned.

[49 FR 8865, Mar. 8, 1984, as amended at 65 FR 58924, Oct. 3, 2000]

1542.705-70 Solicitation and contract clause.

The Contracting Officer shall insert the clause in 1552.242-70, Indirect Costs, in solicitations and contracts where indirect costs apply, unless contracting with an educational institution where

there are approved predetermined final indirect cost rates.

[62 FR 33573, June 20, 1997]

Subpart 1542.12-Novation and Change of Name Agreements 1542.1200 Scope of subpart.

This subpart implements FAR subpart 42.12 and provides policies and procedures for executing and processing novation and change-of-name agreements.

1542.1202 Responsibility for executing

agreements.

(a) Any EPA contracting office upon being notified of a successor in interest to, or change of name of, one of its Contractors shall promptly report such information by memorandum to the Director, Policy, Training and Oversight Division (POTD).

(b) To avoid duplication of effort on the part of EPA contracting offices in preparing and executing agreements to recognize a change of name or successor in interest, only one supplemental agreement will be prepared to effect necessary changes for all contracts between EPA and the Contractor involved. The Chief of the Procurement Policy Branch, Policy, Training and Oversight Division (PTOD), will, in each case, designate the Contracting Office responsible for taking all necessary and appropriate action with respect to either recognizing or not recognizing a successor in interest, or recognizing a change of name agreement.

[49 FR 8865, Mar. 8, 1984, as amended at 55 FR 24580, June 18, 1990; 59 FR 18977, Apr. 21, 1994] 1542.1203 Processing agreements.

(a) The responsible contracting office shall:

(1) Obtain from the Contractor a list of all affected contracts, the names and addresses of the contracting offices responsible for these contracts, and the required documentary evidence.

(2) Verify the accuracy of the list of contracts through the Contract Information System.

(3) Draft and execute a supplemental agreement to one of the contracts affected but covering all applicable outstanding and incomplete contracts affected by the transfer of assets or change of name. A supplemental agreement number need not be obtained for contracts other than for the one under which the supplemental agreement is written. The supplemental agreement will contain a list of the contracts affected and, for distribution purposes, the names and addresses of the contracting offices having contracts subject to the supplemental agreement.

(b) Agreements and supporting documents covering successors in interest shall be reviewed for legal sufficiency by legal counsel.

(c) After execution of the supplemental agreement, the designated office shall forward an authenticated copy of the supplemental agreement to the Director, Policy, Training and Oversight Division, and to each affected contract office.

[49 FR 8865, Mar. 8, 1984, as amended at 59 FR 18977, Apr. 21, 1994]

[blocks in formation]

hazardous or toxic substances in the environment.

(b) The Contracting Officer shall insert the contract clause at 1552.245-71, Government-Furnished Data, in any contract in which the Government is to furnish data to the Contractor. The data to be provided shall be identified in the clause.

(c) The Contracting Officer shall insert the contract clause at 1552.245-72, Fabrication or Acquisition of Nonexpendable Property, in all cost-reimbursement type contracts or contracts with cost-reimbursement portions.

(d) Contracting officers shall insert the clause at 1552.245-73, Government Property, in all cost-type solicitations and contracts regardless of whether Government Property is initially provided, and in all fixed-price solicitations and contracts whenever Government furnished property is provided.

[49 FR 8866, Mar. 8, 1984; 49 FR 24734, June 15, 1984, as amended at 65 FR 58924, Oct. 3, 2000]

Subpart 1545.3-Providing Government Property to Contractors

1545.309 Providing Government production and research property under special restrictions.

Government production and research property, other than foundations and similar improvements necessary for installing special tooling, special test equipment, or plant equipment, shall not be installed or constructed on land not owned by the Government in such fashion as to be nonseverable unless the contract under which the property is provided contains

(a) One of the provisions in FAR 45.309(a);

(b) A requirement that the Government will have the right to abandon in place all nonseverable Government property provided; and

(c) A requirement that the Government will not have any obligation to disassemble or remove the property or to restore or to rehabilitate the premises on which the property is located.

PART 1546-QUALITY ASSURANCE

Subpart 1546.7-Warranties

1546.704 Authority for use of warranties.

AUTHORITY: Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c); and 41 U.S.C. 418b.

Subpart 1546.7-Warranties 1546.704 Authority for use of warranties.

The Contracting Officer shall ensure that the use of a warranty clause in a contract has the concurrence of the Project Officer.

[49 FR 8867, Mar. 8, 1984]

PART 1548-VALUE ENGINEERING [RESERVED]