| Julius Walker Adams - 1880 - 246 pages
...Specifications, without the express sanction of the Engineer in writing. Material, Implements, Labor, etc. — All materials to be provided by the Contractor shall be of the best description, the pipes to conform in every particular to the Specification ; and he shall furnish... | |
| New York (State). Department of Health, New York (State). Board of Health - 1886 - 632 pages
...be corrected immediately on the requirment of the engineer. Rejected materials to be removed (21). All materials to be provided by the contractor shall be of the best description, and he shall furnish all efficient labor and implements necessary for the full and... | |
| New Haven, Connecticut - 1897 - 632 pages
...vitrified paving brick of the Mack Manufacturing Company, and known as the wire-cut paving brick. (15) All materials to be provided by the contractor shall be of the best description; and he shall furnish all efficient labor and implements necessary for the full and... | |
| Pasadena (Calif.), Pasadena, Cal - 1912 - 422 pages
...shall be corrected immediately on the requirement of the Street Superintendent. LABOR AND MATERIALS. All materials to be provided by the contractor shall be of the best description; and he shall furnish all efficient labor and implements necessary for the full and... | |
| Calvin Frank Allen - 1919 - 486 pages
...drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This Article does not exclude the recovery of damages for delay by either party under Article 39 or other provisions in the contract documents. Art. 36. Owner's Right to Do Work. — If... | |
| Calvin Frank Allen - 1919 - 476 pages
...drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This Article does not exclude the recovery of damages for delay by either party under Article 39 or other provisions in the contract documents. however, that the Architect shall approve... | |
| Calvin Frank Allen - 1919 - 490 pages
...drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This Article does not exclude the recovery of damages for delay by either party under Article 39 or other provisions in the contract documents. however, that the Architect shall approve... | |
| American Institute of Architects - 1920 - 208 pages
...drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This article does not exclude the recovery of damages [for delay by either party under article 39 or other provisions in the contract documents. Art. 36. Owner's Right to Do Work.— If... | |
| Saul Gordon - 1923 - 980 pages
...drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This article does not exclude the recovery of damages for delay by either party under Article 39 or other provisions in the contract documents. Article 36. Owner's Right to Do Work.—... | |
| |