Contract Documents for Pumping Station and Grit Chamber Structures and Related Works for the Sewage Treatment Plant at West Jefferson Avenue and River Rouge1937 - 626 pages |
Common terms and phrases
A.S.T.M. Designation additional aluminum American Society amount approved equal arbitration backfill bars bidder bidder's bond bolts brick caisson ring ceramic glazed certified check chromium plated City of Detroit clean coarse aggregate coat Commissioner of Public complete condition construction Contract Documents Contractor shall furnish Contractor shall provide Control House copper cost damages Detroit River directed doors ducts elevation employees Engineer equipment excavation execution expansion joint finished floor foot frames grade Grit Chamber Structures hereby inches inspection installed Interceptor Tunnel joints labor and materials Michigan Michigan Central Railroad mortar necessary operations paint payment performed pipe placed plans Portland Cement Progress Administration proposal Pumping Station Caisson Rack and Grit rails removed roof samples sand sheeting and bracing shown on drawings Sieve Analysis slabs slag Society for Testing Standard Specifications steel bearing piles structural steel subcontractor subgrade Superstructure Surety Bonded surface terrazzo Testing Materials thick tile walls