general procudure and specifications for structural engineering as applied to chemical plant construction |
From inside the book
Results 1-3 of 52
Page
... concrete , moist curing shall be provided for at least the first 3 days . Adequate equipment shall be provided for heating the concrete materials and protecting the concrete during freezing or near - freezing weather . No frozen ...
... concrete , moist curing shall be provided for at least the first 3 days . Adequate equipment shall be provided for heating the concrete materials and protecting the concrete during freezing or near - freezing weather . No frozen ...
Page
... CONCRETE BUILDINGS These specifications on reinforced concrete buildings are hereby incorporated in and made a part of the specifications on Buildings to which they are attached . Section I. Scope The purpose of this specification is to ...
... CONCRETE BUILDINGS These specifications on reinforced concrete buildings are hereby incorporated in and made a part of the specifications on Buildings to which they are attached . Section I. Scope The purpose of this specification is to ...
Page
... concrete from fire the following precautions shall be observed . Steel framework shall be fireproofed with reinforced concrete , brick , tiles of burnt clay , or terra cotta . For columns , trusses , girders or other very important ...
... concrete from fire the following precautions shall be observed . Steel framework shall be fireproofed with reinforced concrete , brick , tiles of burnt clay , or terra cotta . For columns , trusses , girders or other very important ...
Common terms and phrases
A.S.T.M. designation accordance aggregate AIR CONDITIONING DUCT approved painted angle arbitration asbestos attached bars blade bolts building caulking ceiling centers coat compacted compressive strength concrete Contract Documents Contracting Officer dampers density Detailed Specifications diameter dimensions driving DUCT WORK D7.02 DUTY FLOOR FINISH Elbows embankments ENGINEERING CONSTRUCTION D1.00 equipment excavation exhaust systems fastened feet filled flange frame GRADING FOR ROADS gypsum hammer HEAVY DUTY FLOOR hereby incorporated hood hot-dip galvanized inches installed joints lath layers less located locking device louver masonry material maximum methods minimum Owner painted angle iron Permanente Metals Corporation piles pipe placed plans plaster Portland cement purlin rail RAILROADS D3.04 reinforced relayer removed rivets ROADS AND RAILROADS Section secured sheet metal shown on Standard soffits spaced Stairways Standard Drawing STEEL STACKS D6.01 strength structural steel subgrade surface temperature tests thickness U.S. gauge unless otherwise velocity vertical wearing course welding width wire