Water Works PracticeWilliams & Wilkins, 1925 - 790 pages |
From inside the book
Results 1-5 of 34
Page 82
... Highway Department includes in its specifications a provision requiring the contractor to maintain his camp in a proper sanitary condition . The laboratory as an aid in watershed protection In a 82 WATER WORKS PRACTICE.
... Highway Department includes in its specifications a provision requiring the contractor to maintain his camp in a proper sanitary condition . The laboratory as an aid in watershed protection In a 82 WATER WORKS PRACTICE.
Page 511
... . The fact must not be overlooked that time will be an important element in cost . Conservatism in unit prices in valuation is just as important as it is in contracting . If a contractor habitually applies VALUATION 511.
... . The fact must not be overlooked that time will be an important element in cost . Conservatism in unit prices in valuation is just as important as it is in contracting . If a contractor habitually applies VALUATION 511.
Page 512
American Water Works Association. it is in contracting . If a contractor habitually applies the lowest cost figures with which he is familiar , he will soon fail . So too an appraiser must apply reasonable prices if his grand total shall ...
American Water Works Association. it is in contracting . If a contractor habitually applies the lowest cost figures with which he is familiar , he will soon fail . So too an appraiser must apply reasonable prices if his grand total shall ...
Page 571
... contractors Of 54 water works , 24 furnish water to builders by meter ex- clusively , 13 at flat rates based on the ... contractor pays for the water used and the time of the man at the hydrant . The experience of some other works is ...
... contractors Of 54 water works , 24 furnish water to builders by meter ex- clusively , 13 at flat rates based on the ... contractor pays for the water used and the time of the man at the hydrant . The experience of some other works is ...
Page 572
... contractor will pay it when he finds his time is saved and he is well served . Water for building work is generally required to be taken from a service laid into the property where the work is to be done . Some- times the builder is ...
... contractor will pay it when he finds his time is saved and he is well served . Water for building work is generally required to be taken from a service laid into the property where the work is to be done . Some- times the builder is ...
Other editions - View all
Common terms and phrases
aeration alarms amount annual applied arbitration Article assessed average bacteria basins basis buildings capita Capital stock carbon cast iron cent charge chemical chlorine circuits cities coagulation coli Commission connection consumption Contract Contractor corrosion cost Deficiency Scale depreciation determined diameter distribution system district considered electrolysis engine capacity equipment feet filtered water filtration fire flow fire protection service furnished gallons goiter high value district hydrant inches inches inches increase installed iodin Item less limits material maximum metal meter method million gallons municipal necessary operation Owner pipe plant points of deficiency pollution population pounds pressure public fire pumping quantity rapid sand filters removal reservoirs sample sand filters sieves slow sand filters soda ash sodium iodide square standard station storage streams surface tests tion turbidity typhoid fever United valves wastes Water Company water supply water tube boilers
Popular passages
Page 45 - He has the right to have it come to him in its natural state, in flow, quantity and quality, and to go from him without obstruction; upon the same principle that he is entitled to the support of his neighbour's soil for his own in its natural state. His right in no way depends upon prescription, or the presumed grant of his neighbour.
Page 723 - Owner may, upon ten days' written notice, sell such materials at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs and expenses that should have been borne by the Contractor.
Page 523 - Before coming to the question of profit at all the company is entitled to earn a sufficient sum annually to provide not only for current repairs but for making good the depreciation and replacing the parts of the property when the}- come to the end of their life.
Page 718 - No certificate issued nor payment made to the Contractor, nor partial or entire use or occupancy of the work by the Owner, shall be an acceptance of any work or materials not in accordance with this contract. The making and acceptance of the final payment shall constitute a waiver of all claims by the Owner, other than those arising from unsettled liens, from faulty work appearing after final payment, or from requirement of the specifications, and of all claims by the Contractor, except those previously...
Page 523 - The company is not bound to see its property gradually waste, without making provision out of earnings for its replacement. It is entitled to see that from earnings the value of the property invested is kept unimpaired, so that at the end of any given term of years the original investment remains as it was at the Opinion of the Court.
Page 719 - The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the documents is to include all labor and materials, equipment, and transportation necessary for the proper execution of the work.
Page 720 - Contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Architect, he shall bear all costs arising therefrom.
Page 726 - Neither the final payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Owner a complete release of all liens arising out of this contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that...
Page 56 - This term is generally used in statistics and is the square root of the mean of the squares of the percentage variations up and down, without regard to sign, of all the years in the record.
Page 724 - ... at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense incurred by the Owner...