Annual Report (or Report) of the Secretary of War, Part 2U.S. Government Printing Office, 1873 |
From inside the book
Results 1-5 of 100
Page 30
... shore revetment has been constructed - partly by contract . Both piers are now complete . The funds appropriated by act of March 3 , 1873 , will be applied un- der contract to dredging away the whole of the point on the south side and ...
... shore revetment has been constructed - partly by contract . Both piers are now complete . The funds appropriated by act of March 3 , 1873 , will be applied un- der contract to dredging away the whole of the point on the south side and ...
Page 37
... shore revetment has been constructed - partly by contract . Both piers are now complete . The funds appropriated by act of March 3 , 1873 , will be applied un- der contract to dredging away the whole of the point on the south side and ...
... shore revetment has been constructed - partly by contract . Both piers are now complete . The funds appropriated by act of March 3 , 1873 , will be applied un- der contract to dredging away the whole of the point on the south side and ...
Page 103
... shore - line south of the wall , for a distance of about 600 feet , has been much abraded of late years . The sea - wall at the southeast bluff is in good condition , but the shore next to its southern extremity has been worn by the ...
... shore - line south of the wall , for a distance of about 600 feet , has been much abraded of late years . The sea - wall at the southeast bluff is in good condition , but the shore next to its southern extremity has been worn by the ...
Page 111
... shores of the lake have been continued . The triangulation has been completed on the west shore from Green Bay to Kenosha . A base line has been measured near Fond du Lac . A survey of the Detroit River has been begun and is nearly half ...
... shores of the lake have been continued . The triangulation has been completed on the west shore from Green Bay to Kenosha . A base line has been measured near Fond du Lac . A survey of the Detroit River has been begun and is nearly half ...
Page 141
... shore is somewhat bolder in 1872 than in 1861 - an interval of eleven years . It is sought to attribute this change ... shores composed of similar REPORT OF THE CHIEF OF ENGINEERS . 141.
... shore is somewhat bolder in 1872 than in 1861 - an interval of eleven years . It is sought to attribute this change ... shores composed of similar REPORT OF THE CHIEF OF ENGINEERS . 141.
Other editions - View all
Common terms and phrases
act of March Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank Bidders bluff board measure boats breakwater bridge built cents channel Chief of Engineers commenced completed Congress construction contract Corps of Engineers cost Creek cribs cubic yards depth dike distance dredging east ending June 30 ENGINEER OFFICE estimate excavation expended during fiscal feet wide fiscal year ending foot gauge harbor high water improvement inches Island Keokuk lake linear feet lock and dam low water low-water miles Minnesota Point Mississippi River mouth navigation north pier obstructions Ohio Ouachita River piles pound present proposed raft Railroad Red River removed repairs required for fiscal respectfully revetment riprap rock Saint Louis Bay Saint Louis River sand season shoals shore Shreveport side snags steamers stone submitted Superior City superstructure survey timber tion Tone's Bayou Total UNITED STATES ENGINEER velocity vessels width