Annual Report (or Report) of the Secretary of War, Part 2U.S. Government Printing Office, 1873 |
From inside the book
Results 1-5 of 100
Page 30
... pier was extended 642 feet ; the channel deepened by the action of the current , the material com- posing the bottom ... piers at Superior entry had continued to deepen , but that a still greater deepening would in all probability have ...
... pier was extended 642 feet ; the channel deepened by the action of the current , the material com- posing the bottom ... piers at Superior entry had continued to deepen , but that a still greater deepening would in all probability have ...
Page 26
... pier was commenced and extended 719 feet , and the south pier ex- tended 197 feet . During the present season 350 feet will be added to the north pier and 480 feet to the south pier , exhausting the available funds . It is proposed to ...
... pier was commenced and extended 719 feet , and the south pier ex- tended 197 feet . During the present season 350 feet will be added to the north pier and 480 feet to the south pier , exhausting the available funds . It is proposed to ...
Page 28
... pier was completed in 1872. During this season the north pier will be extended 100 feet , and about 18,000 cubic yards of material excavated in the channel . It is proposed to extend the north pier 50 feet farther and to continue the ...
... pier was completed in 1872. During this season the north pier will be extended 100 feet , and about 18,000 cubic yards of material excavated in the channel . It is proposed to extend the north pier 50 feet farther and to continue the ...
Page 29
... pier 400 feet . The construction of the south pier will be deferred until it is deter- mined whether wharves are to be built on the west side of the new harbor . Amount available July 1 , 1872 ......... .. $ 98 , 161 11 Amount ...
... pier 400 feet . The construction of the south pier will be deferred until it is deter- mined whether wharves are to be built on the west side of the new harbor . Amount available July 1 , 1872 ......... .. $ 98 , 161 11 Amount ...
Page 32
... pier was commenced and extended 719 feet , and the south pier ex- tended 197 feet . During the present season 350 feet will be added to the north pier and 480 feet to the south pier , exhausting the available funds . It is proposed to ...
... pier was commenced and extended 719 feet , and the south pier ex- tended 197 feet . During the present season 350 feet will be added to the north pier and 480 feet to the south pier , exhausting the available funds . It is proposed to ...
Other editions - View all
Common terms and phrases
act of March Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank Bidders bluff board measure boats breakwater bridge built cents channel Chief of Engineers commenced completed Congress construction contract Corps of Engineers cost Creek cribs cubic yards depth dike distance dredging east ending June 30 ENGINEER OFFICE estimate excavation expended during fiscal feet wide fiscal year ending foot gauge harbor high water improvement inches Island Keokuk lake linear feet lock and dam low water low-water miles Minnesota Point Mississippi River mouth navigation north pier obstructions Ohio Ouachita River piles pound present proposed raft Railroad Red River removed repairs required for fiscal respectfully revetment riprap rock Saint Louis Bay Saint Louis River sand season shoals shore Shreveport side snags steamers stone submitted Superior City superstructure survey timber tion Tone's Bayou Total UNITED STATES ENGINEER velocity vessels width