Annual Report (or Report) of the Secretary of War, Part 2U.S. Government Printing Office, 1873 |
From inside the book
Results 1-5 of 100
Page 28
... material aid has been afforded to the torpedo trials in progress . I would respectfully recommend an appropriation of $ 1,000 for the pur- chase of engineering material , to continue the present system of instruc- tion of the battalion ...
... material aid has been afforded to the torpedo trials in progress . I would respectfully recommend an appropriation of $ 1,000 for the pur- chase of engineering material , to continue the present system of instruc- tion of the battalion ...
Page 33
... material were removed from the channel , which is now over 12 feet in depth . The amount appropriated at the last session of Congress , $ 10,000 , is being applied to repairs of the old superstructure . To put this harbor in good ...
... material were removed from the channel , which is now over 12 feet in depth . The amount appropriated at the last session of Congress , $ 10,000 , is being applied to repairs of the old superstructure . To put this harbor in good ...
Page 73
... material excavated from the river and give proper banks to the stream . Congress appropriated $ 5,000 June 10 , 1872 , which was expended in 1872 in making a channel of reduced dimensions , the width being about 25 feet and the depth ...
... material excavated from the river and give proper banks to the stream . Congress appropriated $ 5,000 June 10 , 1872 , which was expended in 1872 in making a channel of reduced dimensions , the width being about 25 feet and the depth ...
Page 75
... material behind dikes constructed partly for that purpose and partly to rectify the banks and contract the water - way in some places where needed . The commit- tee on the part of the city have energetically and cordially co - operated ...
... material behind dikes constructed partly for that purpose and partly to rectify the banks and contract the water - way in some places where needed . The commit- tee on the part of the city have energetically and cordially co - operated ...
Page 75
... material behind dikes constructed partly for that purpose and partly to rectify the banks and contract the water - way in some places where needed . The commit- tee on the part of the city have energetically and cordially co - operated ...
... material behind dikes constructed partly for that purpose and partly to rectify the banks and contract the water - way in some places where needed . The commit- tee on the part of the city have energetically and cordially co - operated ...
Other editions - View all
Common terms and phrases
act of March Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank Bidders bluff board measure boats breakwater bridge built cents channel Chief of Engineers commenced completed Congress construction contract Corps of Engineers cost Creek cribs cubic yards depth dike distance dredging east ending June 30 ENGINEER OFFICE estimate excavation expended during fiscal feet wide fiscal year ending foot gauge harbor high water improvement inches Island Keokuk lake linear feet lock and dam low water low-water miles Minnesota Point Mississippi River mouth navigation north pier obstructions Ohio Ouachita River piles pound present proposed raft Railroad Red River removed repairs required for fiscal respectfully revetment riprap rock Saint Louis Bay Saint Louis River sand season shoals shore Shreveport side snags steamers stone submitted Superior City superstructure survey timber tion Tone's Bayou Total UNITED STATES ENGINEER velocity vessels width