Annual Report (or Report) of the Secretary of War, Part 2U.S. Government Printing Office, 1873 |
From inside the book
Results 1-5 of 100
Page 9
... entirely to the construction of the new barbette - batteries . Four magazine - traverses have had the con- crete work completed with the necessary partitions and culverts for draining . Amount appropriated for the fiscal year ending ...
... entirely to the construction of the new barbette - batteries . Four magazine - traverses have had the con- crete work completed with the necessary partitions and culverts for draining . Amount appropriated for the fiscal year ending ...
Page 47
... entirely renewed . In the spring of 1873 operations were resumed with hired labor and the repairs of both piers completed . No further operations are proposed for this season . Amount available July 1 , 1872 Amount expended during the ...
... entirely renewed . In the spring of 1873 operations were resumed with hired labor and the repairs of both piers completed . No further operations are proposed for this season . Amount available July 1 , 1872 Amount expended during the ...
Page 74
... entirely unsatisfactory , and it was decided to defer operations until an additional appropriation should be made . Congress gave $ 2,000 more in the bill of March 3 , 1873. The work was re - advertised , but bids received were again ...
... entirely unsatisfactory , and it was decided to defer operations until an additional appropriation should be made . Congress gave $ 2,000 more in the bill of March 3 , 1873. The work was re - advertised , but bids received were again ...
Page 75
... entirely unsatisfactory , and it was decided to defer operations until an additional appropriation should be made . Congress gave $ 2,000 more in the bill of March 3 , 1873. The work was re - advertised , but bids received were again ...
... entirely unsatisfactory , and it was decided to defer operations until an additional appropriation should be made . Congress gave $ 2,000 more in the bill of March 3 , 1873. The work was re - advertised , but bids received were again ...
Page 109
... entirely rebuilt if the construction of a new one is not authorized . The labor expended in the improvements detailed in his report is 37,595 days ' labor , exclusive of 403 months of regular monthly labor , and 9,549 days of horses and ...
... entirely rebuilt if the construction of a new one is not authorized . The labor expended in the improvements detailed in his report is 37,595 days ' labor , exclusive of 403 months of regular monthly labor , and 9,549 days of horses and ...
Other editions - View all
Common terms and phrases
act of March Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank Bidders bluff board measure boats breakwater bridge built cents channel Chief of Engineers commenced completed Congress construction contract Corps of Engineers cost Creek cribs cubic yards depth dike distance dredging east ending June 30 ENGINEER OFFICE estimate excavation expended during fiscal feet wide fiscal year ending foot gauge harbor high water improvement inches Island Keokuk lake linear feet lock and dam low water low-water miles Minnesota Point Mississippi River mouth navigation north pier obstructions Ohio Ouachita River piles pound present proposed raft Railroad Red River removed repairs required for fiscal respectfully revetment riprap rock Saint Louis Bay Saint Louis River sand season shoals shore Shreveport side snags steamers stone submitted Superior City superstructure survey timber tion Tone's Bayou Total UNITED STATES ENGINEER velocity vessels width