... close of the fiscal year the breakwater was 3,050 feet long , including the return at north end of 300 feet . The superstructure over the last 800 feet has not been laid . It is expected that 1,100 feet will be added to the breakwater ...
... close of the fiscal year the breakwater was 3,050 feet long , including the return at north end of 300 feet . The superstructure over the last 800 feet has not been laid . It is expected that 1,100 feet will be added to the breakwater ...
Page 29
... close of the present season the east pier will be nearly completed , and the west pier extended to the full length proposed . The channel between the piers has been dredged . Periodi- cal dredging will be necessary until the completion ...
... close of the present season the east pier will be nearly completed , and the west pier extended to the full length proposed . The channel between the piers has been dredged . Periodi- cal dredging will be necessary until the completion ...
Page 30
... close of the year the whole of the old slab - piers , a length of 1,382 feet , had been removed and a large amount of dredging done to remove the sand - bank , increasing the least width of water - way from 75 to 115 feet , and 1,042 ...
... close of the year the whole of the old slab - piers , a length of 1,382 feet , had been removed and a large amount of dredging done to remove the sand - bank , increasing the least width of water - way from 75 to 115 feet , and 1,042 ...
Page 34
... close of the fiscal year the breakwater was 3,050 feet long , including the return at north end of 300 feet . The superstructure over the last 800 feet has not been laid . It is expected that 1,100 feet will be added to the breakwater ...
... close of the fiscal year the breakwater was 3,050 feet long , including the return at north end of 300 feet . The superstructure over the last 800 feet has not been laid . It is expected that 1,100 feet will be added to the breakwater ...
Page 35
... close of the present season the east pier will be nearly completed , and the west pier extended to the full length proposed . The channel between the piers has been dredged . Periodi- cal dredging will be necessary until the completion ...
... close of the present season the east pier will be nearly completed , and the west pier extended to the full length proposed . The channel between the piers has been dredged . Periodi- cal dredging will be necessary until the completion ...
Other editions - View all
Common terms and phrases
act of March Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank Bidders bluff board measure boats breakwater bridge built cents channel Chief of Engineers commenced completed Congress construction contract Corps of Engineers cost Creek cribs cubic yards depth dike distance dredging east ending June 30 ENGINEER OFFICE estimate excavation expended during fiscal feet wide fiscal year ending foot gauge harbor high water improvement inches Island Keokuk lake linear feet lock and dam low water low-water miles Minnesota Point Mississippi River mouth navigation north pier obstructions Ohio Ouachita River piles pound present proposed raft Railroad Red River removed repairs required for fiscal respectfully revetment riprap rock Saint Louis Bay Saint Louis River sand season shoals shore Shreveport side snags steamers stone submitted Superior City superstructure survey timber tion Tone's Bayou Total UNITED STATES ENGINEER velocity vessels width