... construction of a light stone wall on the westerly side of the entrance , but the works as built were not sufficient to accom- plish the desired result . This work was done by the town of Harwich . Hog Island , Falmouth , Mass . - The ...
... construction of a light stone wall on the westerly side of the entrance , but the works as built were not sufficient to accom- plish the desired result . This work was done by the town of Harwich . Hog Island , Falmouth , Mass . - The ...
Page 2575
... construction and maintenance of a channel with a navigable depth of from 3 to 4 feet between the jetties , and for a considerable distance up into the bay , the inner end of the channel having a depth of about 2 feet at mean low water ...
... construction and maintenance of a channel with a navigable depth of from 3 to 4 feet between the jetties , and for a considerable distance up into the bay , the inner end of the channel having a depth of about 2 feet at mean low water ...
Page 2598
... construction of a dike across Pinto Pass , just above the mouth of the Mobile River , to concentrate the tidal flow in the chan- nel of the latter stream , and the construction of jetties at Pinto Point and Garrows Bend , at the mouth ...
... construction of a dike across Pinto Pass , just above the mouth of the Mobile River , to concentrate the tidal flow in the chan- nel of the latter stream , and the construction of jetties at Pinto Point and Garrows Bend , at the mouth ...
Page 2608
... construction $ 127,000 . For improvement of the steamboat landing the dredging and other work has cost $ 26,000 . Hannibal , Mo. - To improve this harbor there has been expended , in construction of dams and dredging , $ 45,000 ...
... construction $ 127,000 . For improvement of the steamboat landing the dredging and other work has cost $ 26,000 . Hannibal , Mo. - To improve this harbor there has been expended , in construction of dams and dredging , $ 45,000 ...
Page 2609
... construction $ 127,000 . For improvement of the steamboat landing the dredging and other work has cost $ 26,000 . Hannibal , Mo. - To improve this harbor there has been expended , in construction of dams and dredging , $ 45,000 ...
... construction $ 127,000 . For improvement of the steamboat landing the dredging and other work has cost $ 26,000 . Hannibal , Mo. - To improve this harbor there has been expended , in construction of dams and dredging , $ 45,000 ...
Other editions - View all
Common terms and phrases
amount appropriated approved August authorized azimuth Back azimuth bridge built canal channel Chief of Engineers Clair Clair River completed construction Continuing improvement contract corner of section corporation Corps of Engineers Creek cubic yards depth Detroit River dikes discharge district dredging East East Base ENGINEER OFFICE expended feet wide foot G. L. GILLESPIE gauge Geodetic hereby House Document Numbered hundred Huron Improving harbor inches Island July June 30 Lake Huron Lake Michigan Lake Superior Latitude length lengths-Continued light-house linear feet Lock longitude maintenance Marys River ment mile Mississippi Mississippi River mouth navigation October Oswego Park piers Point Provided Proviso railroad companies Railway Company repair reservoir road Secretary Secretary of War shore line side South span station street submitted in House survey Table of positions thereof thousand dollars tion triangulation Washington Washington Aqueduct West Base wharves