Annual Report (or Report) of the Secretary of War, Volume 2, Part 4U.S. Government Printing Office, 1902 |
From inside the book
Results 1-5 of 100
Page 2600
... provided further , That the depths provided for shall be at mean low water as determined by the engineer officer in local charge of work . * * * Dredging is still in progress . * * * * * was commenced in April , 1901 , and * This ...
... provided further , That the depths provided for shall be at mean low water as determined by the engineer officer in local charge of work . * * * Dredging is still in progress . * * * * * was commenced in April , 1901 , and * This ...
Page 2601
... provided further , That the depths provided for shall be at mean low water as determined by the engineer officer in local charge of work . * * * Dredging * is still in progress . * * was commenced in April , 1901 , and * * ** This ...
... provided further , That the depths provided for shall be at mean low water as determined by the engineer officer in local charge of work . * * * Dredging * is still in progress . * * was commenced in April , 1901 , and * * ** This ...
Page 2625
... provided for increasing its depth to 20 feet in accordance with report and plans submitted December 12 , 1899 , printed in House Doc . No. 232 , Fifty - sixth Congress , first ses- sion . Second , Fox River below Depere , to the ...
... provided for increasing its depth to 20 feet in accordance with report and plans submitted December 12 , 1899 , printed in House Doc . No. 232 , Fifty - sixth Congress , first ses- sion . Second , Fox River below Depere , to the ...
Page 2654
... provided with suitable approaches , and with a sufficient draw , all in accordance with plans and specifications to be approved by the Secretary of War : and there is hereby appropriated ( one - half out of the revenues of the District ...
... provided with suitable approaches , and with a sufficient draw , all in accordance with plans and specifications to be approved by the Secretary of War : and there is hereby appropriated ( one - half out of the revenues of the District ...
Page 2661
... provided with wooden nailing strips . The structure is , however , so designed that an asphalt paving laid on buckle plates may be substituted for the wooden floor in future , if desired . The embankment approaches should be on ...
... provided with wooden nailing strips . The structure is , however , so designed that an asphalt paving laid on buckle plates may be substituted for the wooden floor in future , if desired . The embankment approaches should be on ...
Other editions - View all
Common terms and phrases
amount appropriated approved August authorized azimuth Back azimuth bridge built canal channel Chief of Engineers Clair Clair River completed construction Continuing improvement contract corner of section corporation Corps of Engineers Creek cubic yards depth Detroit River dikes discharge district dredging East East Base ENGINEER OFFICE expended feet wide foot G. L. GILLESPIE gauge Geodetic hereby House Document Numbered hundred Huron Improving harbor inches Island July June 30 Lake Huron Lake Michigan Lake Superior Latitude length lengths-Continued light-house linear feet Lock longitude maintenance Marys River ment mile Mississippi Mississippi River mouth navigation October Oswego Park piers Point Provided Proviso railroad companies Railway Company repair reservoir road Secretary Secretary of War shore line side South span station street submitted in House survey Table of positions thereof thousand dollars tion triangulation Washington Washington Aqueduct West Base wharves