Annual Report (or Report) of the Secretary of War, Volume 2, Part 4U.S. Government Printing Office, 1902 |
From inside the book
Results 1-5 of 100
Page 2584
... Government . In this river dredging is frequently done by two steamboat lines running eight boats . This work is necessary for the removal of shoals which form continually at certain points in the river channels , as the Government work ...
... Government . In this river dredging is frequently done by two steamboat lines running eight boats . This work is necessary for the removal of shoals which form continually at certain points in the river channels , as the Government work ...
Other editions - View all
Common terms and phrases
amount appropriated approved August authorized azimuth Back azimuth bridge built canal channel Chief of Engineers Clair Clair River completed construction Continuing improvement contract corner of section corporation Corps of Engineers Creek cubic yards depth Detroit River dikes discharge district dredging East East Base ENGINEER OFFICE expended feet wide foot G. L. GILLESPIE gauge Geodetic hereby House Document Numbered hundred Huron Improving harbor inches Island July June 30 Lake Huron Lake Michigan Lake Superior Latitude length lengths-Continued light-house linear feet Lock longitude maintenance Marys River ment mile Mississippi Mississippi River mouth navigation October Oswego Park piers Point Provided Proviso railroad companies Railway Company repair reservoir road Secretary Secretary of War shore line side South span station street submitted in House survey Table of positions thereof thousand dollars tion triangulation Washington Washington Aqueduct West Base wharves