Page images
PDF
EPUB

FCCC/P/1995/7/Add.1

English
Page 5

[ocr errors]

(d) The fact that the largest share of historical and current global emissions of greenhouse gases has originated in developed countries, that the per capita missions in developing countries are still relatively low and that the share of global em ssions originating in developing countries will grow to meet their social and development nee is:

(e) The fact that the global nature of climate change calls for the widest possible cooperation by all countries and their participation in an effective and appri priate international response, in accordance with their common but differentiated: esponsibilities and respective capabilities and their social and economic conditions;

(1)

Coverage of all greenhouse gases, their emissions by source: and removals by sinks and all relevant sectors:

(g)

process.

The need for all Parties to cooperate in good faith and to pa ticipa e in this

[ocr errors][merged small]

(a)

The process will, inter alia:

Aim, as the priority in the process of strengthening the com nitme its in Article 4.2(a) and (b) of the Convention, for developed country/other Parti s included in Annex 1, both

to elaborate policies and measures, as well as

to set quantified limitation and reduction objectives within specific d
time-frames, such as 2005, 2010 and 2020, for their anthropogenic emissions
by sources and removals by sinks of greenhouse gases not controlled by the
Montreal Protocol.

taking into account the differences in starting points and approaches, econ ›mic structures and resource bases, the need to maintain strong and sustainable economic grov th, available technologies and other individual circumstances, as well as the need for e‹uitable and appropriate contributions by each of these Parties to the global effort, and also the process of analysis and assessment referred to in section III, paragraph 4, below;

(b) Not introduce any new commitments for Parties not include ♬ in Annex I, but reaffirm existing commitments in Article 4.1 and continue to advance the mpleinentation of these commitments in order to achieve sustainable development, taking in o account Article 4.3. 4.5 and 4.7:

(c)

Take into account anys from the review referred to in Articl: 4.2(f), if available, and any notification referred to in Article 4.2(g);

FCCC/CP/1995/7/Add.1

English
Page 6

(d)

Consider, as provided in Article 4.2(e), the coordination amo 1g Annex I Parties, as appropriate, of relevant economic and administrative instruments taking into account Article 3.5;

(e)

Provide for the exchange of experience on national activities in areas of interest, particularly those identified in the review and synthesis of availabl: natic nal communications; and

(f) Provide for a review mechanism.

III

3.

The process will be carried out in the light of the best avail: ble scientific information and assessment on climate change and its impacts, as well as relevart technical, social and economic information, including, inter alia. reports of the Intergoverninental Panel on Climate Change. It will also make use of other available expertise.

4. The process will include in its early stages an analysis and assessinent, to identify possible policies and measures for Annex I Parties which could contribute to limiting and reducing emissions by sources and protecting and enhancing sinks and reservoirs of greenhouse gases. This process could identify environmental and economic impacts and the results that could be achieved with regard to time horizons such as 2005, 2010, ind 2020).

5. The protocol proposal of the Alliance of Smal! Island State : (AO:IS), which contains specific reduction targets and was formally submitted in accorda ce with Article 17 of the Convention, along with other proposals and pertinent documents, sl ould be included for consideration in the process.

6. The process should begin without delay and be conducted is a matter of urgency, in an open-ended ad hoc group of Parties hereby established, which will report to the second session of the Conference of the Parties on the status of this process. The sessions of this group should be scheduled to ensure completion of the work as early as possible in 1997, with a view to adopting the results at the third session of the Conference of the Parties.

9th plenary meeting 7 April 1995

[merged small][graphic][merged small]
[graphic]
[graphic]
« PreviousContinue »